Loading...
PA0101-LR030307 GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 Concrete Compression Test Report Client: Project: JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schrickel, Rollins & Assocs., Inc. (1) JMC Construction, LP TMI Report No.: DC02-115-047 Report Date: 03/07/2003 Specifications Test Data Strength 3000 psi @ 28 Days Placement Date 02/05/2003 Slump 4 in max Sampled By Zuhair Shubbar Air Content 6 % max Weather Cloudy Concrete Temperature n/a Supplier/Mix Lattimore Materials/863 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 3155350 Time Batched: 12:58 pm Slump: 6 in* Air Content: 8.0 %* Concrete Temperature: 58° F Ambient Temperature: 49° F Placement Location: Paving, trail Sample Location: Trail 3 behind day care Time Sampled: 1:38 pm Unit Weight: n/a Yardage (c.y.): 20of 50 An astedsk (*) appears next to field data which does NOT meet specifications. Age, Max Load Area Strength Fracture Set # Cylinder Test Date (days) (lbs. force) (sq.in.) (psi) Type 1 cpt02050301 02/12/2003 7 77340 28.27 2730 unbonded cap 1 cpt02050302 03/05~2003 28 109790 28.37 3870 unbonded cap 1 cpt02050303 03/05/2003 28 114890 28.37 4050 unbonded cap I cpt02050304 Hold 28 day average 3960 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. TERRA-MAR, INC. Mike Fuller Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. o~ssp Page I ot'2 GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 7522g phone: (g72) 488-8800 fax:(972) 488-8080 Concrete Compression Test Report Client: Project: JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP TMI Report No.: DC02-115-047 Report Date: 03/07/2003 Specifications Test Data Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Placement Date Sampled By Weather Supplier/Mix Air Content Method 02/05/2003 Zuhair Shubbar Cloudy Lattimore Materials/863 ASTM C-231-B Ticket Number: 3155364 Slump: 5 in* Concrete Temperature: n/a Placement Location: Paving, trail Time Batched: Air Content: Ambient Temperature: Sample Location: Trail 4 at NE corner of lake An astedsk (*) appears next to field data which does NOT meet specifications. _ ......... 3:18 pm Time Sampled: 4:25 pm 7.2 %* Unit Weight: n/a 50° F Yardage (c.y.): 70 of 70 ILL in Age Max Load Area Strenqth Set # Cyl# der Test Date (days) (lbs. force) (sq.in.) (psi~ Fracture Type 2 cpt02050305 02/12/2003 7 78920 28.27 2790 unbonded cap 2 cpt02050306 03/05/2003 28 116490 28.37 4110 unbonded cap 2 cpt02050307 03/05/2003 28 122840 28.37 4330 unbonded cap 2 cpt02050308 Hold 28 day average 4220 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. ~like Fuller TERRA-MAR, INC. ~ ~ ~ Project Manager The results presented in this repo~ pekin only to ~e specific items tested. ~is repo~ was produ~d for the exclusive use of the client. Any reproduction of this mpo~, or any pa~ therein, is strictly prohibited without the express ~ffen ~nsent of TMI. OmSD Page 2 or'2