Loading...
PA0101-LR030117Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road DC02-115-040 01/17/2003 TMI Report No.: Report Date: Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdcket, Rollins & Assocs., Inc. (1) JMC Construction, LP Test Data Specific~afions Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Placement Date Sampled By Weather Supplier/Mix Air Content Method 12/19/2002 Rick Yarbrough Pt. CloudyANindy Lattimore Materials/864 ASTM C-231-B Ticket Number: 3154153 Time Batched: 12:24 pm Time Sampled: 1:15 pm Slump: 5.5 in* Air Content: 5.0 % Unit Weight: n/a Concrete Temperature: 62° F Ambient Temperature: 63" F Yardage (c.y.): 10 of 40 Placement Location: Sidewalk Sample Location: Trail #3, Station 28+00 An asterisk (*) appears next to field data which does NOT meet specifications. Age Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psi} Type 1 cpt12190201 12/26/2002 7 93620 28.27 3310 unbonded cap 1 cpt12190202 01/16/2003 28 110400 28.27 3900 unbonded cap 1 cpt12190203 01/16/2003 28 109990 28.27 3890 unbonded cap 1 cpt12190204 Hold 28 day average 3900 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. *CITY OF COPPELL INSPECTOR INFORMED OF SLUMP. The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. O~SSD P~ge ! or'!