Loading...
PA0101-LR021226Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone.' (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road TMI Report No.: DC02-115-037 Report Date: 12/26/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs,, Inc. (1) JMC Construction, LP Specifications Strength 3000 psi @ 28 Days Placement Date Slump 4 in max Sampled By Air Content 6 % max Weather Concrete Temperature n/a Supplier/Mix Ambient Temperature n/a Air Content Method Test Data 12/17/2002 Zuhair Shubbar Pt. Cloudy Lattimore Materials/864 ASTM C-231-B Ticket Number: 3154063 Time Batched: 1:23 pm Time Sampled: 2:54 pm Slump: 5.5 in* Air Content: 4.4 % Unit Weight: n/a Concrete Temperature: 68° F Ambient Temperature: 70° F Yardage (c.y.): 40 of 50 Placement Location: Trail Paving Sample Location: Trail #3, Station 17+00 An asterisk (*) appears next to field data which does NOT meet specifications. Age Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psf~ Type 1 cpt12170201 12/24/2002 7 95160 28.37 3350 1 cpt12170202 01/14/2003 28 1 cpt12170203 01/14/2003 28 1 cpt12170204 Hold Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31. C39. C138. C143, C172, C1064. and C617 or C1231. unbondedcap TERRA-MAR, INC. ">"?' '-/// Mike Fuller / / Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. Page I of I