Loading...
ST9304-CS 970305 DALLAS COUNTY PUBLIC WORKS March 5, 1997 Mr. Ken Griffin, P.E. Assistant City Manager/City Engineer City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Belt Line Road -- Project No. 490-403.1 / 91-829 (Denton Tap Road to MacArthur Boulevard) Project Slams Dear Mr. Griffin: On February 24, 1996, Dallas County met with the City of Coppell to discuss the proposed project. At that time the City's review comments along with the following issues were discussed by Dallas County. Co,--"~.,-j~ / The Interlocal Agreement (ILA) between the City and the County place the /' incorporate these items into the final consLruction and bid package. The County will provide base drawings for your design. - The City wishes to further evaluate brick paver bands verses pavers tb. roughout the~ .:, c" Moore and Mockingbird intersections. i'he Consultant will not further revise the; paver layout until the City as decided. - Line B was discussed at the City/County meeting. Later research of the County's files shows that Coppell directed the County to use the existing 10' drainage easement on August 23, 1996. At that time Coppell and the County were evaltmfing several drainage options for this project. Due the other drainage options chosen, Line B can now be drained to Line C. However, based on Coppell's previous direction the County will not ask that the Consultant modify Line B nor Line C unless the City specifically requests this change. - / Sidewalks, bridge lights and bridge railings were also discussed at the City/County ,/ meeting. Further research of the County's files shows that on January 11, 1995, .:' .,.' ,_. % Coppell directed the County to not include sidewalks, etc. on the bridge. ~ ;,. ,~ ,z However, the County will ask the Consultant to both review the bridge amenity b"': -/_r ~.~r layout provided by Coppell and to evaluate incorporating these amenities into the / plans. The County will then inform Coppell of the costs of these amenities and Coppell can make a final decision on the amenities. 411 Elm Street Dallas, Texas 75202 653-7151 Mr. Ken Griffin, P.E. March 5, 1997 Page 2 Dallas County has accepted the preliminary drainage plans prepared by the Consultant. The Consultant is scheduled to submit final right-of-way and easement documents on March 31, 1997. As soon as Coppell provides their drainage approval, the Consultant will be directed to begin pre- final plan preparation. Please contact either myself or Jill M. Brim at 214-653-7151 as soon as possible to continue the progress of this project. Sincerely, Allen Bud Beene, 2~;lic Wo~ xc: Michael A. Martin, City of Coppell - Engineering 829\COPPELL4.LTR