Loading...
PA0101-LR021210Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 In-Place Soil Moisture/Density Tests by Nuclear Method JMC Construction, LP. Coppell Trails 363 N. Denton Tap Road Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP TMI Report No.: DC02-115-034 Report Date: 12/10/2002 Specifications Percent Compaction: +92% rain +98% max Moisture Content: opt +2% to +4% Test Data Date Tested: 12/06/2002 Technician: Mohammed A. Kashem Optimum Maximum Dry Curve No. Test Method Matedal Description Moisture % Density pcf 9293 ASTM D-698-A Brown Sandy Clay 15.0 107.5 Test Elevation Ref. Probe Percent Wet Density Dry Density Percent No or Lift Location Curve Depth Moisture (pcf) (pct') Density Trail #3 38.0 Grade at Station 31+65 at East approach of 120' 9293 6" 18.5 124.2 104.8 97.5 bridge Test results on this report meet project specification. Test Method(s): ASTM D-2922, ASTM 13-3017 Gauge: Troxler Gauge SN: 33086 Std. Density Count: 2880 TERRA-MAR, INC. "' [ -/ Mike Fuller / / Project Manager The results presented in this report pertain only to the specific items tested, This report was produced for the exclusive use of the clienL Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. ,7ssr~ Page l of 1