Loading...
PA0101-LR021209Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road TMI Report No.: DC02-115-027 Report Date: 12/09/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schrickel, Rollins & Assocs., Inc. (1) JMC Construction, LP Test Data Specifications ........ Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Placement Date 11/08/2002 Sampled By Adolph Ortiz Weather Clear/Windy Supplier/Mix Lattimore Materials/883 Air Content Method ASTM C-231-B Ticket Number: 6185278 Time Batched: 10:41 am Slump: 4 in Air Content: 3.5 % Concrete Temperature: 68° F Ambient Temperature: 70° F Placement Location: Hike & bike trails Sample Location: Shady Brown Park, Coppell Trail ~4, Station 9+00 Time Sampled: 11:30 am Unit Weight: n/a Yardage (c.y.): 14 of 42 Age Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psi} Type 1 cpt11080201 11/15/2002 7 88400 28.27 3130 unbonded cap 1 cptl 1080202 12/06/2002 28 117100 28.27 4140 unbonded cap I cptl 1080203 12/06/2002 28 117230 28.27 4150 unbonded cap 1 cpt11080204 Hold 28 day average 4150 Normal cylinder size: 6"x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172. C1064, and ce17 or C1231, TERRA-MAR, INC. Mike Fuller Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TML Page I of I