Loading...
PA0101-LR021127Client: Project: GEOTECI'INICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW '11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road TMI Report No.: DC02-115-021 Report Date: 11/27/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schrickel, Rollins & Assoc.~s., Inc. (1) JMC Construction, LP Specifications Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Placement Date Sampled By Weather Supplier/Mix Air Content Method Test Data 10/29/2002 Matt Adams Cloudy LATTIMORE MATERIALS/864 ASTM C-231-B Ticket Number: Slump: Concrete Temperature: Placement Location: 3152318 Time Batched: 9:33 am 5.5 in' Air Content: 4.2 % 65° F Ambient Temperature: 57° F Hike & Bike Trail #3, 48' x 4' leave out Time Sampled: 10:25 am Unit Weight: n/a Yardage (c.y.): 10 of 30 Sample Location: At 2' South & 21' West of NE corner of leave out An asterisk (*) appears next to field data which does NOT meet specifications. in Age Max Load Area Strength Fracture Set # Cyl#der Test Date (days} (lbs. force) (sq.in.) (psi} Type 1 cpt10290201 11/05/2002 7 95910 28.37 3380 unbonded cap 1 cpt10290202 11/26/2002 28 126560 28.37 4460 unbonded cap 1 cpt10290203 11/26/2002 28 127100 28.37 4480 unbonded cap 28 day average 4470 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. TERRA-MAR, INC. The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express wdtten consent of TMI. Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln,, Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road TMI Report No.: DC02-115-023 Report Date: 11/27/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City ef Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP Specifications Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Test Data Placement Date 10/31/2002 Sampled By Matt Adams Weather Cloudy Supplier/Mix Lattimore Materials/863 Air Content Method ASTM C-231-B Ticket Number: 3152487 Time Batched: 12:29 pm Slump: 4.75 in* Air Content: 3.7 % Concrete Temperature: 74° F Ambient Temperature: 67° F Placement Location: Trail ~ Time Sampled: 1:15 pm Unit Weight: n/a Yardage (c.y.): 40 of 80 Sample Location: At Station 1+50 on Trail ~4 An asterisk (*) appears next to field data which does NOT meet specifications. in Age Max Load Area Strength Fracture Set # Cyl#der Test Date (days) Obs. force) (sq.in.) (psi) Type 1 cpt10310201 11/07/2002 7 83760 28.27 2960 unbonded cap 1 cpt10310202 11/28~002 28 129580 28.27 4580 unbonded cap I cpt10310203 11/28~002 28 128680 28.27 4550 unbonded cap 28 day average 4570 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. TERRA-MAR, INC. '"""/ ' ,~ ~ikeFuller x/ // Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. ['age I of 2 Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln,, Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 365 N. Denton Tap Road TMI Report No.: DC02-115-023 Report Date: 11/27/2002 Concrete Compression Test Report Report Distribution: (1) CRy of Coppell (1) City of Coppell (1) Schrickel, Rollins & Assocs., Inc. (1) J MC Construction, LP Specifications Test Data Strength 3000 psi @ 28 Days P;acement Date 10/31/2002 Slump 4 in max Sampled By Matt Adams Air Content 6 % max Weather Cloudy Concrete Temperature n/a Supplier/Mix Lattimore Materials/863 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 3152498 Time Batched: 3:26 pm Time Sampled: 4:30 pm Slump: 5 in* Air Content: 3.2 % Unit Weight: n/a Concrete Temperature: 72° F Ambient Temperature: 68° F Yardage (c.y.): 40 of 80 Placement Location: Trail #4 Sample Location: At Station 2+50 on Trail An asterisk (*) appears next to field data which does NOT meet specifications. m Age Max Load Area Strength Fracture Set # Cyl#der Test Date (days) (lbs. force) (sq.in.) (psi] Type 2 cpt10310205 11/07~002 7 86430 28.27 3060 unbonded cap 2 cpt10310206 11/28/2002 28 116720 28.27 4130 unbonded cap 2 cpt10310207 11/28/2002 28 117170 26.27 4140 unbonded cap 28 day average 4140 Normal cylinder' size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138 C143, C172, C1064, and C617 or C1231. TERRA-MAR, INC. Mike Fuller// Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express wdtten consent of TMI. t~SSD Page 2 ot' 2