Loading...
PA0101-LR021113Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 1050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road TMI Report No.: Report Date: DC02-115-009 11/13/2002 Specifications Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schrickel, Rollins & Assocs., Inc. (1) JMC Construction, LP Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Test Data Placement Date 10/15/2002 Sampled By Adolph Ortiz Weather Clear Supplier/Mix Lattimore Materials/863 Air Content Method ASTM C-231-B Ticket Number: 3151875 Time Batched: 10:36 am Slump: 6 in* Air Content: 3.0 % Concrete Temperature: 72° F Ambient Temperature: 74° F Placement Location: Sidewalk trails Sample Location: Coppell Trail #1, Shady Brown West, Station 12 An asterisk (*) appears next to field data which does NOT meet specifications. Time Sampled: 11:25 am Unit Weight: n/a Yardage (c.y.): 40of 90 Age. Max Load Area Strength Set # Cyl~der Test Date (days] Obs. force) (sq.in.) (psi} I cpt10150201 10/22/2002 7 86990 28.27 3080 1 cpt10150202 11/12/2002 28 107930 28.37 3800 1 cpt10150203 11/12/2002 28 108100 28.37 3810 28 day average 3810 Fracture Type unbonded cap unbonded cap unbonded cap Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. TERRA-MAR, INC. // Mike Fuller Project Manager The results presented in this repod pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is stdcUy prohibited without the express written consent of TMI. Page t o1'2 0155D Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS PORT WORTH HOUSTON AUSTIN LONGWEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP TMI Report No.: Report Date: DC02-115-009 11/13/2002 Specifications Test Data Strength 3000 psi @ 28 Days Placement Date 10/15/2002 Slump 4 in max Sampled By Adolph Ortiz Air Content 6 % max Weather Clear Concrete Temperature n/a Supplier/Mix Lattimore Materials/863 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 3151882 Time Batched: 11:51 am Slump: 4.5 in* Air Content: 4.7 % Concrete Temperature: 72° F Ambient Temperature: 74° F Placement Location: Sidewalk trails Sample Location: Coppell Trail, Shady Borwn West #1, Station I Time Sampled: 12:30 pm Unit Weight: n/a Yardage (c.y.): 80 of 90 An asterisk (*) appears next to field data which does NOT meet specifications. Age Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs, force) (sq.in.) (psi~ Type 2 cpt10150204 10/22/2002 7 88310 28.27 3120 unbonded cap 2 cpt10150205 11/12/2002 28 110800 28.37 3910 unbonded cap 2 cpt10150206 11/12/2002 28 111310 28.37 3920 unbonded cap 28 day average 3920 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. TERRA-MAR, INC. !"' // M~ke Fuller / / Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express wdtten consent of TMI. Page 2 or' 2 0155D