Loading...
PA0101-LR021112 GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ab/es Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax.'(972) 488-8080 In-Place Soil Moisture/Density Tests by Nuclear Method Client: Project: JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schrickel, Rollins & Assocs., inc. (1) JMC Construction, LP TMI Report No.: DC02-115-025 Report Date: 11/12/2002 5 peciflcations Percent Compaction: +92% rain +98% max , Moisture Content: opt +2% to +4% Test Data Date Tested: 11/07/2002 Technician: Robert Estep Optimum Maximum Dry Curve No. Test Method Material Description Moisture % Density pcf 9295 ASTM D-698-A Brown & Gray Sandy Clay 14.5 110,0 Test Elevation Ref. Probe Percent Wet Density Dry Density Percent No or Lift Location Curve Depth Moisture (pcf) (pct') Density Retest 23.1 Retest Retest of test 23.0 dated 11/06/02 9295 6" 17.0 125.1 105.9 97.2 Test results on this report meet project specification. Test Method(s): ASTM D-2922, ASTM D-3017 Gauge: Troxler Gauge SN: 33109 Std. Density Count: 2918 Std. Moisture Count: 671 TERRA-MAR, INC. The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. 07SSD Page I of