Loading...
PA0101-LR021111 GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 1'1050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-,3800 fax:(972) 488-8080 In-Place Soil Moisture/Density Tests by Nuclear Method Client: Project: JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP TMI Report No.: DC02-115-024 Report Date: 11/11/2002 _ Specifications I Percent Compaction: +92% min +98% max Moisture Content: opt +2% to +4% Test Data Date Tested: 11/06/2002 Technician: Mohammed A. Kashem Curve No. Test Method 9295 ASTM D-698-A Brown & Gray Sandy Clay Optimum Maximum DRY" Matedal Description Moisture % Density pcf 14.5 110.0 Test Elevation Ref. Probe Percent Wet Density Dry Density Percent No or Lift Location Curve Depth Moisture (pcf) (pc'f) Density Trail #4 22.0 Grade at Station 6+50 9295 6" 16.5 125.2 107.5 97.7 23.0 Grade at Station 8+00 9295 6" 21.5' 127.9 105.3 95.7 An asterisk (*) appears next to test results which do NOT meet the project specifications. Test Method(s): ASTM D-2922, ASTM D-3017 Gauge: Troxler Gauge SN: 33086 Std. Density Count: 2880 Std. Moist~,9.Count: 710 TERRA-MAR, INC. "7 t ,//- ~ - Mike Fuller / / Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express wdtten consent of TMI. 1~TSSD Page I or' l GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 Concrete Compression Test Report Client: Project: JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP TMI Report No.: DC02-115-007 Report Date: 11/11/2002 Specifications Test Data Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Placement Date Sampled By Weather Supplier/Mix Air Content Method 10/14/2002 Adolph Ortiz Cloudy Lattimore Materials/863 ASTM C-231-B Ticket Number: 3151786 Slump: 4.5 in* Concrete Temperature: 72° F Placement Location: Coppell Trail Time Batched: n/a Air Content: 3.8 % Ambient Temperature: 68° F Sample Location: Shady Brown West #1, Station 5 An asterisk (*) appears next to field data which does NOT meet specifications. Time Sampled: 11:00 am Unit Weight: n/a Yardage (c.y.): 40 of 140 Age, Max Load Area Strength Fracture Set # Cylinder Test Date (days~ (lbs. force) (sq.in.) (psi) Type 1 cpt10140201 10/21/2002 7 78490 28.27 2780 unbonded cap 1 cpt10140202 11/11/2002 28 98420 28.27 3480 unbonded cap I cpt10140203 11/11/2002 28 98280 28.27 3480 unbonded cap 28 day average 3480 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172. C1064, and CS17 or C1231. Informed Superitendent of wet unmixed concrete. TERRA-MAR, INC. Mike Fuller Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is stdctly prohibited without the express wdtten consent of TMI. I)ISSD Page I or'3 Client: Project: TMI Report No.: Report Date: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppetl Trails 363 N. Denton Tap Road DC02-115-007 11 / 11/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppeil (1) Schrickel, Rollins & Assocs., Inc, (1) JMC Construction, LP S pecificafions Strength 3000 psi @ 28 Days Slump 4 in max Air Content 6 % max Concrete Temperature n/a Ambient Temperature n/a Placement Date Sampled By Weather Supplier/Mix Air Content Method Test Data 10/14/2002 Adolph Ortiz Cloudy Lattimore Materials/863 ASTM C-231-B Ticket Number: Slump: Concrete Temperature: Placement Location: 3151799 Time Batched: 11:53 am 5 in* Air Content: 4.5 % 4" F Ambient Temperature: 70.7° F Coppell Trail, sidewalk trail Sample Location: Shady Brown West #1, Station 7 An asterisk (*) appears next to field data which does NOT meet specifications. Time Sampled: 12:30 pm Unit Weight: n/a Yardage (c.y.): 80 of 140 in Age Max Load Area Strength Fracture Set # Cyl#der Test Date (days) (lbs. force) (sq.in.) (psi) Type 2 cpt10140204 10/21/2002 7 71390 28.27 2520 unbonded cap 2 cpt10140205 11/11/2002 28 97410 28.27 3440 unbonded cap 2 cpt10140206 11/11~002 28 97560 28.27 3450 A-cone 28 day average 3450 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, anct C617 or C1231. Informed Superintendent of concrete slump. TERRA'MAR, INC. - Y / p rMo j ieKcet MFaU~ laegre r The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is s~ctly prohibited without the express wdtten consent of TMI. Pagc 2 oi'3 Client: Project: TMI Report No.: Report Date: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road DC02-115-007 11/11/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schfickel, Rollins & Assocs., Inc. (1) JMC Construction, LP Specifications Test Data Strength 3000 psi @ 28 Days Placement Date 10/14/2002 Slump 4 in max Sampled By Adolph Ortiz Air Content 6 % max Weather Cloudy Concrete Temperature n/a Supplier/Mix Lattimore Materials/863 Ambient Temperature n/a ,Air Content Method ASTM C-231-B Ticket Number: 3151808 Time Batched: 1:14 pm Time Sampled: 1:45 pm Slump: 5.5 in* Air Content: 4.1% Unit Weight: n/a Concrete Temperature: 72" F Ambient Temperature: 70° F Yardage (c.y.): 120 of 140 Placement Location: Coppell Trails sidewalk trail Sample Location: Shady Brown West #1, Station 9 An asterisk (*) appears next to field data which does NOT meet specifications. Age, Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psi) Type 3 cpt10140207 10/21~002 7 65300 28.27 2310 unbonded cap 3 cpt10140208 11/11/2002 28 98410 28.27 3480 unbonded cap 3 cpt10140209 11/11/2002 28 97630 28.27 3450 unbonded cap 28 day average 3470 Nonmal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31,639, C138, C143, C172, C1064, and C617 or C1231. TERRA-MAR, INC. The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express wdtten consent of TMI. Page 3 of 3