Loading...
PA0101-LR021105 GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 Concrete Compression Test Report Client: Project: JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP TMI Report No.: DC02-115-020 Report Date: 11/05/2002 Specifications Test Data Strength 3000 psi @ 28 Days Placement Date 10/24/2002 Slump 4 in max Sampled By Greg Mason Air Content 6 % max Weather Cloudy Concrete Temperature n/a Supplier/Mix Lattimore Materials/864 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 3152211 Time Batched: n/a Slump: 5 in* Air Content: 4.1% Concrete Temperature: 71 ° F Ambient Temperature: 65° F Placement Location: Coppell Trails, behind day care Sample Location: Station 40+00 Time Sampled: 10:32 am Unit Weight: n/a Yardage (c.y.): 40 of 80 An asterisk (*) appears next to field data which does NOT meet specifications. Age. Max Load Area Stren~lth Fracture Set # Cyl#der Test Date (days) (lbs. force) (sq.in.) (psi'} Type 1 cpt10240201 10/31/2002 7 105380 28.27 3730 I cpt10240202 11/21/2002 28 I cpt10240203 11/21/2002 28 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. unbonded cap TERRA-MAR, INC. Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproducfion of this report, or any part therein, is strictly prohibited without the express written consent of TMI. msso Page I of 2 Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALI_AS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road TMI Report No.: DC02-115-020 Report Date: 11/05/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP Specifications Test Data Strength 3000 psi @ 28 Days Placement Date 10/24/2002 Slump 4 in max Sampled By Greg Mason Air Content 6 % max Weather Cloudy/Rain Concrete Temperature n/a Supplier/Mix Lattimore Materials/864 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 31522231 Time Batched: 10:51 am 4.25 in* Air Content: 4.1% 70° F Ambient Temperature: 60° F Coppell Trails behind day care Time Sampled: 12:30 pm Unit Weight: n/a Yardage (c.y.): 80 of 80 Station 5+25 An astedsk (*) appears next to field data which does NOT meet specifications. Age. Max Load Area Strength Fracture Set # Cyl~der Test Date (days~ (lbs. force) (sq.in.) (psi) Type 2 cpt10240204 10/31/2002 7 112490 28.27 3980 2 cpt10240205 11/21/2002 28 2 cpt10240206 11/21/2002 28 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. unbonded cap TERRA-MAR, INC. v -/~ / Mike Fuller f Project Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is stdcUy prohibited without the express written consent of TMI. I)ISSD Page 2 o1'2 Client: Project: GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 JMC Construction, L.P. Coppell Trails 363 N. Denton Tap Road TMI Report No.: DC02-115-021 Report Date: 11/05/2002 Concrete Compression Test Report Report Distribution: (1) City of Coppell (1) City of Coppell (1) Schdckel, Rollins & Assocs., Inc. (1) JMC Construction, LP Specifications Test Data Strength 3000 psi @ 28 Days Placement Date 10/29/2002 Slump 4 in max Sampled By Matt Adams Air Content 6 % max Weather Cloudy Concrete Temperature n/a Supplier/Mix LA'I-rlMORE MATERIALS/864 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 3152318 Time Batched: 9:33 am 5.5 in* Air Content: 4.2 % 65° F Ambient Temperature: 57° F Hike & Bike Trail #3, 48' x 4' leave out Time Sampled: 10:25 am Unit Weight: n/a Yardage (c.y.): 10 of 30 At 2' South & 21' West of NE corner of leave out An asterisk (*) appears next to field data which does NOT meet specifications. Age, Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psi} Type 1 cpt10290201 11/05/2002 7 95910 28.37 3380 1 cpt10290202 11/26/2002 28 1 cpt10290203 11/26/2002 28 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. unbonded cap TERRA-MAR, INC. The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. 0155D Pgg~ ] of l