Loading...
PA9702-LR 990804 (3)CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter h'wy., Suite #100 Dallas, Texas 75247 Date of Service: 07/14/1999 Report No.: 9919117 Report Date 0810411999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~PReid 300BlockofParkwayBlvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. 4496051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETESUPPLmR: Nelson pLACEMENT DATE: 07/14/1999 BATCH TIME: 12:30pm PLANT: 1 TIME SAt, fiLED: 1:29pm BY: Dan'in Phillips SPECIFICATION REQUIREMENTS WEA'IIIER CONDmONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 92 F CONCRETE: 95 F sLtr~n,: 5.0" Max TEUCKNO: 217 TICKET NO: N/A AIR: N/A AIR CONTENT (~): N/A UNrrWEmHT(pd): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Grade Beam: AtoE&4.2to7 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: B/3.1 REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COM~RESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bs. force) (p~') TYPE 1 1 5.75 07/21/1999 7 90200 3190 1 2 5.75 07/21/1999 7 97440 3450 Average 3320 1 3 5.75 08/11/1999 28 1 4 5.75 08/11/1999 28 Techuidan: Darrin Phillips Started: ll:30am Finished: 2:30pro ~ +grg~ring, Inc. Report Distribution: (1) City of Coppell (1) City ofCoppcll - Engineering (I) Bfinkiny Sargent A~chitects (1) City ofCoppell - Bldg. Insp, (1)TurnerEngineers (l)CityofCoppell-LeisureServDcpt ~.- EugeneHarbour Vice President (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without die written approval of HBC Engineering, Inc. 01LL Page 1 of 1