PA9702-LR 990804 (3)CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter h'wy., Suite #100
Dallas, Texas 75247
Date of Service: 07/14/1999 Report No.: 9919117 Report Date
0810411999
Client No.: COPPELL Project No.: 94991118
Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr
Attn: Bra~PReid 300BlockofParkwayBlvd
732 DeForest
Coppell TX 75019 Coppell, Texas/Prj. 4496051
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A
CONCRETESUPPLmR: Nelson pLACEMENT DATE: 07/14/1999 BATCH TIME: 12:30pm
PLANT: 1 TIME SAt, fiLED: 1:29pm BY: Dan'in Phillips
SPECIFICATION REQUIREMENTS WEA'IIIER CONDmONS: Clear
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 92 F CONCRETE: 95 F
sLtr~n,: 5.0" Max TEUCKNO: 217 TICKET NO: N/A
AIR: N/A AIR CONTENT (~): N/A UNrrWEmHT(pd): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Grade Beam: AtoE&4.2to7
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: B/3.1
REPORT OF TESTS ACCUMULATIVE YARDS: 20
CYLINDER MEASURED MAXIMUM COM~RESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) 0bs. force) (p~') TYPE
1 1 5.75 07/21/1999 7 90200 3190
1 2 5.75 07/21/1999 7 97440 3450
Average 3320
1 3 5.75 08/11/1999 28
1 4 5.75 08/11/1999 28
Techuidan: Darrin Phillips Started: ll:30am Finished: 2:30pro ~ +grg~ring, Inc.
Report Distribution:
(1) City of Coppell (1) City ofCoppcll - Engineering
(I) Bfinkiny Sargent A~chitects (1) City ofCoppell - Bldg. Insp,
(1)TurnerEngineers (l)CityofCoppell-LeisureServDcpt ~.- EugeneHarbour
Vice President
(I) Hisaw & Associates
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without die written approval of HBC Engineering, Inc.
01LL Page 1 of 1