Loading...
PA0101-CS021007-1'9:59 9 25299994 IMC CANSTRI11:TIOH, LP PAGE Construction, L.P. Native American Owned http : / /www.jmc- construction.com October 7. 2Q02 John Elias, Park Planner City or Coppell P.U. Box 475 Coppell, TX 75019 Re: Contract no. Q- 0502 -02 Coppell Trail Sections - Bridge Delay Dear Mr. Elias: We � otr or] S - . ", 13 to bring to your attention the delay in the bridge design after the City's Project Architrxt rriec *tic a ;::,ign twat was completely consistent with the project specifications. We asked for Your h i in expedii ra the design. We wrote you again on Sept. 10 to emphasize that we were still not we needed in order to progress to the point where we could place the bridge order. 13ascd an t;S : > ;-3icO specificatiorls, we expected to have the design submittal approved within a couple we .v s vA'the Node; to Proceed and that would have allowed us to place the order, expecting delivery the r`,. , _•ak of Decr— udhtr. That schedule would have enabled us to meet the date of substamial completion As it now stands, the re- design of the bridge has delayed us 4 weeks so far and the re- design has not yet been approved. If the re- design is rejected for some reason, we are looking at even more lost time. 'For this reason we are requesting a 60 -day extension to our contract — to March 25, 2003. While you letter of Sept. 24, 2002 clearly states the City's position with regard to the additional overhead we ar, incurring as a result of the bridge order delays, we have received your verbal assurance that this dt;lay 1 uuld not be a reason for the City to claim liquidated damages if and when the project is not compicted by 1124/03. We are doing all that is in our power to provide the City with the Park as planned. These uelays are causing us to incur additional overhead expenses for completing this contract. We adV;se you a�Tain that the additional overhead expenses are real and that we expect the City of Coppell to make an equitable adjustment to our contract to compensate us for our additional costs. We are good contractors and know that the City of Coppell will be fair regarding this issue. Sind �& lien Bell Nlana-grer for Its General Parlmer RVIC C : nstYuction Management, L.L.C. SB:v: mcoc. a.- se.'ti'Cery.yoE Gcvfoppdt Trn;; C� Bf ad Waters — Schrit'hel, Rollins and Assoc., Inc- 9593 west Unrvet -6ty or;ce. Suite *1 19, McKinney, TX 7)(771 Phase (972) X29.9393 • F (972) S ?9 e- rn�il: bt9bciE!ujmccgnstrixCtian. cam h[lp';lwww.j mcconmucrion.cbtri