PA0101-CS030331Coppell Trail Sections City of Coppell, TX Items to be Completed January 27, 2003- (Revised 2- 12 -03) (Revised 3- 13 -03) (Revised 3- 24 -03) All comments that have been stfieken are considered approved. Items that are not stricken need additional work. When appropriate, additional comments have been added to certain items. 3 -12 -03 — Not all items have been reviewed for this punch list. A final walk will be necessary in order to determine the status of all remaining items. General Comments Oil 1. Ments. 2. All areas disturbed by machinery and construction activities must be sodded as directed in the contract documents. All areas that have previously been sodded within this contract and have been disturbed by must be repaired or resodded_ 3 -12 -03 — Per directive by the Denton County Levee District, all areas that have been disturbed by construction activities along Trail #3 and not sodded must be hydroseeded with Common Bermudagrass. The specification for hydroseeding that was used in other areas of the project can be used minus the application of Annual Ryegrass. Silt protection will be needed in areas around the existing concrete channels. Based on the grades constructed versus the grades shown on the plans, the slope has been constructed in a way that presents a ledge within the existing concrete channels located closest to the day care center. If grading a "U" shaped swale at the upstream end of the channels will not solve the problem without creating an un- maintainable slope, then a concrete retaining wall will be required at no additional cost to the owner. A site visit may be required to adequately illustrate the concerns of the Levee District. Coordinate with the Landscape Architect and the Owner. 3 -24 -03 — Levee engineer is being consulted as to appropriate measures to solve grade problems at concrete flumes. 3. All trails edges, either concrete or chat, must be graded flush to trail edge as per the contract documents. 4. Concrete trails must be striped as directed in the contract documents. 4345 1 2 -12 -03 - Much of the striping is unacceptable. There are many areas where the paint is already flaking and other areas where the striping is not c entered on the trail. Please make necessary repairs to all striping. 3 -12 -03 -- Striping is still unacceptable in all areas that were inspected on 3- 12 -03. Striping must be repaired. 3 -24 -03 — Striping is still unsatisfactory in many areas of the trail.) 6. Remove all soil and debris piles from the project that are results from construction activities. 7. All marking paint used during construction must be removed from the concrete trails. Andy Brown West Trail (Trails #1 & #2) i The leeataefi feF the ehaVeeFiErete trail Onterseetien on the East eFid of the trail has This should he transiteened inte the existin ehat tFail that Pens towards the pad(in I C L.....rds fl8st be used aFtd the - Ee nrrc tieR Faus be ffla de - `' toe 3. There appears to be several locations where drainage will be poor near the beginning of the chat trail on the East end of the trail. Contractor shall provide the Landscape Architect and the City with a series of grades in this area in order to determine the best -fit solution for this problem. Boring under the trails and installing underground drains that will daylight into the creek are a viable option. 2 -12 -03 - Per direction of the City of Coppell, water is standing in several areas along the chat trail. Additional work is needed to prevent standing water. Refer to the attached photographs for direction to drainage problems. Drainage problems are not limited to the locations depicted in these photographs. 3 -13 -03 — The drainage along the chat trail is still unacceptable. Where the drains were installed, additional grading is necessary in order to have a smooth transition along the drain. Many of the drains were not installed in the actual low spots. This work is sub par. 3 -24 -03 — Grades around inlets are not acceptable. Small catch basins must be graded so as to provide safe grade transitions. The location where the contractor gained access to the site for construction is poorly graded and contains unwanted rock and debris. This area needs additional sod and removal of all foreign objects. 4345 2 5. All form boards on the chat trail must be reasonably straight, free of hazardous splintering, placed at elevations that allow water to surface drain off the trail and not serve as a trip hazard, and placed where the ends of each board meet flush with the end of each subsequent board. Contractor shall repair all form boards that do not meet these criteria. 2 -12 -03 - Many form boards are still very crooked. Contractor shall straighten all crooked form boards. 3-12-03 — Damage to the chat trail from construction activities must be repaired, 1 3 — Remove all splinters deemed hazardous. •• ♦ •• is needed in the location where the chat trail curves around the soccer field. This area of chat trail is also in poor condition and needs additional wor ' repaif this �Z' C- shall repair all damage done te the SeEeeF f elds. Play will be fe very quiekly at these fields and this Fepair must be hmgh eH the list ef prffioFities rVZ Fir 0 NFEWT • _ . .: .• -- Y 4345 3 t 0 i n Pl 031hI.0 Sy SNI��OH '1H;d�IHHjS Nd Br :01 E007 O apVl the p list % thFeUgh and net the emaet locati m lowep than the gFades ealled ()at for in the p l a ns. tr Y fiel si en the 50eeeF • Y and • • i 1 d uring construction. 21. 3 -24 -03 — Provide densities on chat trail to ensure specification and city code compliance. Trail #4 3. The drainage Swale between the trail and the fields must be restored and graded as per the plans. 2 -12 -03 - This area did not drain sufficient water during the recent rain. It must be regarded. 3 -24 -03 — The drainage swale located in the centerfield of the West field is not to desired grade. Additional gradework is required. irrigation.. duiatng censtfuetion- 4345 4 y V :0 00 S31v1 cy ± GJI�� '131 :cN 4NNh, p4 "u 1 11. Gentr-aeteF shall smeeth afiel place a sandy loam i R tiFe futs, that aFe leeated witliin the beanelaFy Of the playing fields en the Eaqt-I of the paF!(. Th s Fnkfst be done 12. Contractor shall place sandy loam in tire ruts where equipment damaged existing grades where they accessed Moore Road. These areas must also be sodded. 2 -12 -03 - The area that must be addressed in this item is located at the curb on Moore Road where trucks accessed the site. The area has been rutted and must be topdressed with sandy loam and sodded. 3 -24 -03 — Sandy loam topdressing and hydroseeded Bermudagrass is an acceptable solution in this area_ Trail #3 �Levee) M . r Fi eanefete i • i i 4345 a 'd :' � CW S31 "I�CSSC SJ '03 '13)1`13HES b ^d Y6 0i EOEE c aei "I 111 11 IASI III 111 11 11, 11 PI • i� i �- r� i r. - ONKNOW ' ON r • PAR 401W I" NIP. 0-NNIMS • V 4345 a 'd :' � CW S31 "I�CSSC SJ '03 '13)1`13HES b ^d Y6 0i EOEE c aei "I 14. Remove all trees under the 120 If. bridge that were marked on the plans to be removed. This includes removing stumps and debris. 2 -12 -03 - All soil and debris must be cleaned from the concrete bank. der. 16. 2 -12 -03 - Remove all silt fencing from the bank of the levee. 3 -24 -03 — Silt fence is still present in some areas. 17. 2 -12 -03 - Clean around construction dumpster and hydroseed all disturbed areas. 3 -24 -03 — This area has not been addressed. 18. 3 -12 -03 — Per pervious directive from the Landscape Architect and the Owner, the bike rail crossing Box Culvert "A" and Box Culvert "B" are both required to have a rub rail as per the detail. As of 3- 12 -03, only Box Culvert "A" had a rub rail. 3 -24 -03 — This work still has not been done. 19. 3 -24 -03 — All concrete spoils must be removed from all areas of the trail. 20. 3 -24 -03 — The small sidewalk near the day care center that was connected to the trail has unfinished edges and debris that must be addressed. 21. 3 -24 -03 — The manhole located West of the 120' bridge must be repaired. 22. 3 -24 -03 — Tire ruts from construction equipment located on the levee near the day care center must be repaired. 23. 3 -24 -03 — All existing trees must be free from dirt spoils resulting from trail grading. All grades at tree bases must be returned to pre- construction conditions. Any dirt piled on tree bases will result in tree death. 24. 3 -24 -03 — Additional sod is required between the day care fence and the trail. Concrete spoils must also be removed prior to sodding. 4345 rC'' =id C31y� SNI110d `13`I H�S W "6b0i �00?'�aeW 1161 Corporate Drive West, Suite 200 Arlington, Texas 76006 Volce (817)649 -$216 FAX (817)649 -7645 =6V To: Kent Hughlett From: Brad Waters Fax: 972.529-9394 Pages: 6 co: JMC Construction Date: 3.31.03 Re: Coppell Trail Sections CC: John Elias- 972 - 462 -5149 ❑ Urgent ❑ For Review ❑ Please comment ❑ Please Reply ❑ Please Recycle 772 - 34 3s70 4002 Sb9L +6b9 +Li8