Loading...
SS9901-AG030610* HE - ° I * . - ° P DEPT: Engineering /Public Works AGENDA REQUEST FORM COPPELL DATE: June 10 2003 O' -V Q o * ^ a ITEM #: 9/B ITEM CAPTION: Consider approval of amending the contract with Turner Collie and Braden, Inc. for the design of Deforest Road and Sandy Lake Road Lift Stations and Force Main Improvements in an amount of $70,365 as provided for in water /sewer CIP funds; and authorizing the City Manager to sign. CITY COUNCIL GOAL(S): ' IL EXECUTIVE SUMMARY: 010 Motion to Approve M - York S - Peters Vote - 6 -0 Tunnel] absent a� This agreement will allow the redesign of the force main to provide an alternate bid to tunnel/bore the majority of MacArthur Blvd. from Deforest Rd. to Sandy Lake Rd. This should preserve the majority of the existing trees and landscaping within the median from Deforest Rd. to Sandy Lake Rd. This revision could also result in a less expensive construction cost when compared with open cutting the median and replacing all irrigation, landscaping and trees. Staff recommends approval of this amendment to the contract and will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: Funds have been allocated in the water /sewer self funded CIP accounts. RgIdIY eye er ... am m ,.,... clay Daum DIR. REVIEW: FIN. REVIEW: CM REVIEW: J Da W5� e5 1805]V -05IXI' Agenda Request Form - Revised 09/02 Document Name: #LiftStationl -AR TurnerCollieOBraden Inc. Engineers • Planners • Project Managers June 3, 2003 17300 Dallas Parkway Suite 1010 Dallas, Texas 75248 Tel (9721735 -3000 Fax: (972) 735 -3001 TCB Job No. 052131124.0001.00020.Al23 Deforest & Sandy Lake LS Improvements Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell 255 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019 -4409 RE: DeForest and Sandy Lake Wastewater Lift Stations and Force Main Improvements Supplemental Agreement No. 2 Dear Mr. Griffin: After execution of this Supplemental Agreement No. 2, the Engineering Services Contract between the City of Coppell and Turner Collie & Braden Inc. for the DeForest and Sandy Lake Wastewater Lift Stations and Force Main Improvements will be modified as follows: The Engineering Services Contract is revised to increase the compensation from $415,289 to 5485,654, an increase of $70,365. This increase in compensation is requested due to additions to the Scope of Services as described in Exhibit A and Exhibit B attached hereto. Compensation for these services will be in accordance with the original Engineering Services Contract dated March 7, 2001, Section 3A - Compensation. All other terms and conditions of the Engineering Services Contract dated March 7, 2001 are unchanged and remain in full force and effect. Turner Collie & Braden Inc. City of Coppell By; By: obert C. Reac , E. Senior Vice resident Date: J" 3� 2.o03 F�Idblished in 1946 Engineering Excellence for Over One -Half Century 4' A 1 ( M Q"mrnw MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Kenneth M. Griffin, P.E., Director of Engineering/Public Works Date: June 10, 2003 RE: Consider approval of amending the contract with Turner, Collie and Braden, Inc. for the design of Deforest Road and Sandy Lake Road Lift Stations and Force Main Improvements in an amount of $70,365 as provided for in water /sewer CIP funds; and authorizing the City Manager to sign. In June 2000, the City of Coppell entered into a design contract with Turner, Collie and Braden in the amount of $405,863 for the design of a new lift station at Deforest Road, a modification of the existing lift station on Sandy Lake Road, the design of a new force main along MacArthur Blvd. from the Deforest Rd. Lift Station to the Sandy Lake Rd. Lift Station, and the design of an additional force main from the Sandy Lake Rd. Lift Station south to Belt Line Road. During the design phase, the City of Coppell tried to be sensitive to the existing trees and landscaping within the median of MacArthur Blvd. from Deforest Rd. to Sandy Lake Rd. However, the only corridor available to install a force main is within the existing median. A force main does not have to be a gravity flow system, so therefore it can be installed shallower than a normal gravity sewer system. With the existing utilities in MacArthur Blvd., both along the roadway and crossing the roadway, the design is such that there are numerous bends within the proposed force main to go either over or under existing utilities. Also, in an attempt to save numerous trees along the area, we have instructed the design consultant to specify boring in numerous locations along MacArthur Blvd. We have also included numerous bends in the design to go around existing trees and improvements. The design of the original project is nearing completion. In discussions with the consultant, it has been noted several times that we are concerned with the design of the force main because of its impact on existing improvements and if there are there any other options available. The consultant has researched various options and is recommending that the City explore the possibility of using directional drilling on this project. Directional drilling is a technique that you see throughout the City of Coppell utilized by the various utility companies to install their conduit. It is a technique that has evolved expeditio i n the last few years so that there is greater control over the drilling both in depth and in location. We have visited with a contractor and reviewed the equipment and the operation and we have visited with a vendor to review the type of material that would be utilized in a directional- boring concept. Using directional boring on this project allows us the opportunity to bore beneath long sections of MacArthur Blvd. without disturbing the surface area. The line would be approximately 20 -25 feet deep. The pipe material is a polyethylene and should not need maintenance, therefore, the depth is not a concern. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" The concept of directional boring intrigues me and quite possibly gives the City the opportunity to construct this project without the removal of large amounts of trees, landscaping and irrigation. To utilize the concept of directional boring, the construction plans need to be revised. The original concept is nearing completion, therefore, to change the construction concept prior to the bidding of the project requires a redesign of the project. Approximately 40 sheets of the construction plans need to be revised to show the concept of directional boring as opposed to open cut. If this amendment to the contract is approved, then we have instructed Turner, Collie and Braden, Inc. to retain the original design, create an alternate design with the directional boring and then bid both designs. This will give us the opportunity to compare cost differentials between the two concepts. The consultant has estimated that the directional boring construction could potentially be several hundred thousand dollars less expensive than the open cut concept. The majority of this estimated cost savings is associated with labor, and replacement of existing trees, irrigation, landscaping, etc. The actual material utilized in the directional boring is higher priced on a per /foot basis as opposed to the material that would be utilized in an open cut method. Bidding both concepts will give a true representation of the cost differential. Even if the directional boring does bid slightly higher than the open cut, I would probably still recommend that directional boring concept because of the opportunity to preserve the existing irrigation, trees and landscaping along the median of MacArthur Blvd. Staff recommends approval of the amendment to the contract with the consultant in the amount of $70,365 . Staff will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" ,�v < IL s. ,� m DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE Option 1 - DI Pipe by Open Cut wNertical Pipe Loop (bore under trees) Item No. Description Unit Quantity Unit Price Total 1 30" DI Force Main by open cut (cement - lined, poly - wrapped, restrained) LF 5879 $125 $734,875 2 30" DI Force Main by bore with 48" steel encasement LF 2856 $550 $1,570,800 3 Ductile Iron Fittings TN 32.86 $3,000 $262,840 4 Vertical pipe loop (30" DI pipe, 20 ft tall w /concrete base) LS 1 $15,000 $15,000 5 4" Combination A/V Valve EA 11 $3,000 $33,000 6 Precast MH (5' diameter, approx. 5 -10 ft deep) EA 10 $5 jw $58,000 7 Sod (assume 10' trench width) SY 4936 $4.00 $19,744 8 Replace /relocate irrigation lines, other underground utilities LS 1 $25,000.00 $25,000 9 Traffic Control LS 1 5`5,000 $5,000 10 Storm Water Pollution Prevention LS 1 $11,500 $11,500 Sub -Total $2,735,759 10% Contingency $273,576 Estimated Construction Duration: 300 calendar days Total $3,009,335 City of Coppell Coppel Line D- Construction Estimate 04 -25 -03 Line D April 25, 2003 DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE Option 5 - HPDE Pipe (Directional Drilling) Item No. Description Unit Quantity Unit Price Total 1 30" HDPE Force Main by directional drilling Material (30" DIPS DR 17) LF 7752 $465,120 Installation LF 7752 $150 $1,162,800 2 Excavation /backfill of access pits EA 12 $15,000 $180,000 3 30" HDPE Force Main by open cut (SDR 21) LF 914 $160 $146,240 4 HDPE Fittings 30" 45 deg Elbow EA 4 53,900 $15,600 30" x 18" Branch Saddle EA 5 $4,500 $22,500 30" Flange Adapter w/ Back -up Ring EA 2 S3,200 $6,400 18" Flange Adapter w/ Back -up Ring EA 5 52,700 $13,500 5 Hydrostatic testing of HDPE piping LS 1 $15,000 $15,000 6 4" Combination A/V Valve EA 5 $3,000 $15,000 7 Precast MH (6' diameter, approx. 10 ft deep) EA 5 $7,000 $35,000 8 Sod SY 1680 $4 $6,720 9 Traffic Control LS 1 $5,000 $5,000 10 Storm Water Pollution Prevention ($2500 for plan, $1.50 /LF silt fence) LS 1 $10,000 $10,000 Sub -Total $2,098,880 10% Contingency $209,888 Estimated Construction Duration: 150 calendar days Total $2,308,768 City of Coppell Coppel Line D- Construction Estimate 04 -25 -03 Line D April 25, 2003 EXHIBIT A SUPPLEMENTAL AGREEMENT NO.2 SCOPE OF SERVICES DEFOREST AND SANDY LAKE LIFT STATIONS AND FORE MAIN IMPROVEMENTS 0.0 GENERAL 0.1. Project Description The additional services to be provided for this project consist of the re- design of the 20" force Main Line "A" and "B" and the 30" Force Main Line "D" to allow for the use of polyethylene pipe and directional drilling to help minimize the disruption to the median along Macarthur Boulevard. The new design of the proposed force mains will be advertised as an alternate bid to the original design using ductile iron pipe. 2.0 FINAL DESIGN • Add general notes related to the installation of PE pipe and the installation method of directional drilling. • Update quantity sheets for the new alignments. • Update the project layout sheets to show the design changes. • Modify horizontal and vertical alignment on the plan and profile sheets for the installation of PE pipe using directional drilling. • Provide details required for PE pipe and directional drilling. • Provide specifications required for PE pipe and directional drilling. • Provide new bid tabulation • Prepare bid documents for bid of original design and alternate bid of PE pipe. 4.1 SURVEYING • Provide meets and bounds for one (1) Easement 4.2 GEOTECHNICAL SERVICES • Provide fifteen (15) — thirty (30) feet deep bores along proposed force main alignments. Approximately one(1) bore every 1000 feet. EXHIBIT B City of Coppell, Texas 05/22/03 DeForest and Sandy Lake Wastewater Lift Stations and Force Main Improvements SUPPLEMENTAL AGREEMENT NUMBER 2 oraaw ooR V woo TASK LISTING Pr ana e Magce r En Prgi e ne e r ie staff En weer Senior Technician Technician � Clerical TOTAL $ 224 Reproduction (Reports) Deliveries 15 - 30; Bores on Alignment $50 Postage $50 Mileage 1 Easement 750 Computer Use 218 hours CADD $10 /hr $2,180 Line A & B 15.00% $544 NON -LABOR TOTAL 11 11 $4, 168 General Notes 2 1 1 $245 Quantities 8 12,550 1 0 $815 Project Layout (2) 2 4 $410 Line A - Plan & Profiles (11) 1 22 66 1 66 $12,760 Line B - Plan & Profiles (2) 2 6 6 $1160 Details (1) 2 4 $410 Line D 7 $665 Quantities 16 2 $1,630 Project Layout (4) Line D - Plan & Profiles (20) 40 4 120 6 120 $710 $23,200 Specifications Bid Tabulaiton 4 2 20 12 8 4 $2,860 $1,620 Alternate Bid 8 40 8 $5,280 TOTAL HOURS 78 305 1 1 218 12 613 LABOR EXPENSE TOTALS $10,140 1 $28,975 1 1 $11,990 $660 $51,765 r� 1 �.ao rvvn -�novn � Task $1,120 Plotting 40 sheets x $7 /sheet x 4 submittals Subcontract I Expense Reproduction (Plans) 40 sheets x 8 sets x $0.701sheet $ 224 Reproduction (Reports) Deliveries 15 - 30; Bores on Alignment $50 Postage $50 Mileage 1 Easement 750 Computer Use 218 hours CADD $10 /hr $2,180 Administrative 15.00% $544 NON -LABOR TOTAL 11 11 $4, 168 JU�V V IY 1 RNV 1 VM1 JLM1 V r✓�✓ r+�✓ n ✓,�,rr�• Subcontractor Task Lab & Ex p. Admin. 15.110%4 s contracts Subcontract I Expense Terra -Mar 15 - 30; Bores on Alignment 11,800 1,770 Survcon 1 Easement 750 113 :� 863 TOTALS 12,550 1,883 0 $14.433 TOTAL ESTIMATE $70,365 DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE Option 1 - DI Pipe by Open Cut wNertical Pipe Loop (bore under trees) Item No. Description Unit Quantity Unit Price Total 1 30" DI Force Main by open cut (cement - lined, poly- wrapped, restrained) LF 5879 $125 $734,875 2 30" DI Force Main by bore with 48" steel encasement LF 2856 $550 $1,570,800 3 Ductile Iron Fittings TN 32.86 58,000 $262,840 4 Vertical pipe loop (30" DI pipe, 20 ft tall w /concrete base) LS 1 $15,000 $15,000 5 4" Combination AN Valve EA 11 53,000 $33,000 6 Precast MH (5' diameter, approx. 5 -10 ft deep) EA 10 S5,800 $58,000 7 Sod (assume 10' trench width) SY 4936 $4.00 $19,744 8 Replace /relocate irrigation lines, other underground utilities LS 1 $25,000.00 $25,000 9 Traffic Control LS 1 $5,000 $5,000 10 Storm Water Pollution Prevention LS 1 $11,500 $11,500 Sub -Total $2,735,759 10% Contingency $273,576 Estimated Construction Duration: 300 calendar days Total $3,009,335 City of Coppell Coppel Line D- Construction Estimate 04 -25 -03 Line D Page 1 of 5 April 25, 2003 DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE Option 2 - DI Pipe by Open Cut w/Vertical Pipe Loop (replace trees) Item No. Description Unit Quantity Unit Price Total 1 30" DI Force Main by open cut (cement - lined, poly- wrapped, restrained) LF 6629 $125 $828,625 2 30" DI Force Main by bore with 48" steel encasement LF 2106 $550 $1,158,300 3 Ductile Iron Fittings TN 32.86 58,000 $262,840 4 Vertical pipe loop (30" DI pipe, 20 ft tall w /concrete base) LS 1 $15,000 $15,000 5 4" Combination A/V Valve EA 11 53,000 $33,000 6 Precast MH (5' diameter, approx. 5 -10 ft deep) EA 10 55,800 $58,000 7 Replace trees EA 25 $750 $18,750 8 Replace /relocate irrigation lines, other underground utilities LS 1 $25,000.00 $25,000 9 Sod (assume 10' trench width) SY 5770 $4.00 $23,080 10 Traffic Control LS 1 55,000 $5,000 11 Storm Water Pollution Prevention LS 1 $12,500 $12,500 Sub -Total $2,440,095 10% Contingency $244,010 Estimated Construction Duration: 300 calendar days Total $2,684,105 City of Coppell Coppel Line D- Construction Estimate 04 -25 -03 Line D Page 2 of 5 April 25, 2003 DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE Option 3 - HPDE Pipe by Open Cut (bore under trees) Item No. Description Unit Quantity Unit Price Total 1 30" HDPE Force Main by open cut (SDR 21) LF 5879 5160 $940,640 2 30" HDPE Force Main by bore (no encasement) LF 2856 5500 $1,428,000 3 HDPE Fittings 30" 45 deg Elbow EA 11 53,900 $42,900 30" 30 deg Elbow EA 2 53,400 $6,800 30" 22.5 deg Elbow EA 8 53,300 $26,400 30 "11.25 deg Elbow EA 13 ;,3,000 $39,000 30" x 18" Branch Saddle EA 11 ;;4,500 $49,500 30" Flange Adapter w/ Back -up Ring EA 2 ;,3,200 $6,400 18" Flange Adapter w/ Back -up Ring EA 11 $2,700 $29,700 4 4" Combination A/V Valve EA 11 $3,000 $33,000 5 Precast MH (5' diameter, approx. 5 -10 ft deep) EA 10 55,800 $58,000 6 Replace /relocate irrigation lines, other underground utilities LS 1 $25,000.00 $25,000 7 Sod (assume 10' trench width) SY 4936 $4.00 $19,744 8 Traffic Control LS 1 S5,000 $5,000 9 Storm Water Pollution Prevention ($2500 for plan, $1.50 /LF silt fence) LS 1 $1 1,500 $11,500 Estimated Construction Durations 300 calendar days City of Coppell Line D Page 3 of 5 Sub -Total $2,721,584 10% Contingency $272,158 Total $2,993,742 Coppel Line D- Construction Estimate 04 -25 -03 April 25, 2003 DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE Option 4 - HPDE Pipe by Open Cut (replace trees) Item No. Description Unit Quantity Unit Price Total 1 30" HDPE Force Main by open cut (SDR 21) LF 6629 $160 $1,060,640 2 30" HDPE Force Main by bore (no encasement) LF 2106 $500 $1,053,000 3 HDPE Fittings 30" 45 deg Elbow EA 11 53,900 $42,900 30" 30 deg Elbow EA 2 53,400 $6,800 30" 22.5 deg Elbow EA 8 53,:',00 $26,400 30 "11.25 deg Elbow EA 13 S3,00o $39,000 30" x 18" Branch Saddle EA 11 54,500 $49,500 30" Flange Adapter w/ Back -up Ring EA 2 53,200 $6,400 18" Flange Adapter w/ Back -up Ring EA 11 $2,700 $29,700 4 4" Combination A/V Valve EA 11 :,3,000 $33,000 5 Precast MH (5' diameter, approx. 5 -10 ft deep) EA 10 55,800 $58,000 6 Replace Trees EA 25 5750 $18,750 7 Replace /relocate irrigation lines, other underground utilities LS 1 $25,000.00 $25,000 8 Sod SY 5770 $4 $23,080 9 Traffic Control LS 1 5)5,000 $5,000 10 Storm Water Pollution Prevention ($2500 for plan, $1.50 /LF silt fence) LS 1 512,500 $12,500 Sub -Total $2,489,670 10% Contingency $248,967 Estimated Construction Duration: 300 calendar days Total $2,738,637 City of Coppell Coppel Line D- Construction Estimate 04 -25 -03 Line D Page 4 of 5 April 25, 2003 DEFOREST ROAD LIFT STATION IMPROVEMENTS FORCE MAIN LINE D CONSTRUCTION COST ESTIMATE Option 5 - HPDE Pipe (Directional Drilling) Item No. Description Unit Quantity Unit Price Total 1 30" HDPE Force Main by directional drilling Material (30" DIPS DR 17) LF 7752 $465,120 Installation LF 7752 $150 $1,162,800 2 Excavation /backfill of access pits EA 12 $15,000 $180,000 3 30" HDPE Force Main by open cut (SDR 21) LF 914 $160 $146,240 4 HDPE Fittings 30" 45 deg Elbow EA 4 53,900 $15,600 30" x 18" Branch Saddle EA 5 44,500 $22,500 30" Flange Adapter w/ Back -up Ring EA 2 53,200 $6,400 18" Flange Adapter w/ Back -up Ring EA 5 $2,700 $13,500 5 Hydrostatic testing of HDPE piping LS 1 $15,000 $15,000 6 4" Combination AIV Valve EA 5 $3,000 $15,000 7 Precast M (6' diameter, approx. 10 ft deep) EA 5 $7,000 $35,000 8 Sod SY 1680 $4 $6,720 9 Traffic Control LS 1 $5,000 $5,000 10 Storm Water Pollution Prevention ($2500 for plan, $1.50 /LF silt fence) LS 1 $10,000 $10,000 Sub -Total $2,098,880 10% Contingency $209,888 Estimated Construction Duration: 150 calendar days Total $2,308,768 City of Coppell Coppel Line D- Construction Estimate 04 -25 -03 Line D Page 5 of 5 April 25, 2003 1. Af ILJ 14?1 �l P, FrIMMM" r a rayll3mu y. 1 41111 rayll3mu