SS9901-CS030612Ken Griffin - Re: Force Main _ Page 1 From: Ken Griffin To: Sugg, Ted Subject: Re: Force Mains Ted See notes below. ken g >>> "Sugg, Ted" <ted.sugg @tcb.aecom.com> 06/12/03 02:45PM >>> Ken, Thanks for the faxed copy of the signed supplemental agreement to re- design the force mains using PE pipe and directional drilling. During construction of the force mains, it will be necessary to close some of the median openings on MacArthur Blvd. We are assuming that any of the "turn around" median openings can be closed for a long period of time to accommodate the construction. There are several other median openings on MacArthur that may be required to be closed for a two to four week period for use during construction and others that may be required to be closed for a day or two when the pipe is pulled in. Below is a list of all median openings along Macarthur. Could you indicated whether that median opening could be closed for a long period of time (2 to 4 weeks), a short period of time (1 to 2 days) or never. We will try to use the turn around median opening whenever possible for the closures that will require a long period of time, but some of the median opening listed below will have to be closed at least for the pull in of the pipe. Line D Samual Blvd. /Village Drive never Lake Forest Drive 2_4 Water Side Drive 1 -2 Allen Road 1 -2 N. Village Parkway 1_2 Parkway Boulevard never Teal Lane / Laguna Drive 1-2 Line A Condor Drive 2 -4 Bethel School Road 1-2 Ken Griffin - Re: Fo Main Fire Station... Never Riverchase Drive never Entrance to strip center at Beltline which one? I was also wondering what the status of your review of the Sandy Lake List Station plans were. Let me know when I can get those to complete the design of the lift station. Thanks Ted Sugg, P.E. Project Manager Turner Collie & Braden Inc. 17300 Dallas Parkway, Suite 1010 Dallas, Texas 75248 -1145 (972) 735 -3000 Fax (972) 735 -3001 Direct 972 - 735 -3048 E -Mail: ted.sugg(&tcb.aecom.com Page 2 I