Loading...
ST9301-CS030421 (2)*JACOBS Jacobs Civil Inc. 6688 North Central Expressway Suite 400, MB 13 Dallas, Texas 75206 U.S.A. 1.214.696.3433 Fax 1.214.696.3499 April 21,2003 City Of Coppell 255 Parkway Blvd PO Box 9478 Coppell, TX 75019 Attention: Ken Griffin Reference: Sandy Lake Road Design Revisions Dear Mr. Griffin: Jacobs is pleased to present you with our proposed fee estimate and scope of work description for additional design work on Sandy Lake Rd. As requested, we have shown the design fee in two parts. The first part includes just the miscellaneous design changes. The second part includes the work to lower the profile of the roadway to meet ONCOR's elevation requirements. Also, a separate item is shown for the administrative time that will need to be added to whichever design option(s) is/are agreed upon. This fee estimate is based on our recent discussions and evaluation of the detailed scope of work. Our fees will be billed out to the City as time & material not to exceed the total values shown on the "Fee Estimate for Sandy Lake Rd Revisions". Could you please forward a copy of the City of Coppell's standard contract agreement to our office? I will make sure our legal department is reviewing it while we finalize the Scope of Work. I look forward to your response as to which of the design options the City would like to pursue with Jacobs Civil Inc. Please do not hesitate to contact me at 214-424-7579. Sincerely, JACOBS CIVIL INC. Debbie Kiger, P.E. Civil Engineer Enclosu res Copy: Mark Goode PF 13480-501 A Subsidiary of Jacobs Engineering Group Inc. DESIGN SCOPE OF WORK Sidewalk · The sidewalk will be shown on the south side of the project. · The grading (cross sections) will have to be revised at the right turn lane onto Riverchase, there isn't enough flat grade there for the sidewalk. Drainage at Riverchase · The drainage area map and hydraulic computations will not be revised. · The cross sections will not be revised. · The existing drainage pipe to the south as well as a newly constructed pipe from the east will be tied into the Sandy Lake Rd system. Stomi line - vs - Utility Encasement Pot Holes for Utilities · These issues will be handled as added bid items on the quantity list. · There will be a quantity and cost that is available for payment as deemed necessary by the inspector & contractor. · A description will be included in the specifications so that the work included in each bid item is clarified. Sprinkler Conduit/Pipes · Jacobs will coordinate with the parks department to determine size required for the conduit. · Jacobs will not show the irrigation design, just the basic piping in the median. HC Ramps · Jacobs will include the City of Dallas Detail 25 ID in the plan set, which meets the newest ADA standards. · The crosswalks and median noses will be modified to meet the new ramp locations. Lower the Profile of Sandy Lake Rd. · After coordinating with Jon Scarborough on behalf of ONCOR, Jacobs will lower part of the profile of Sandy Lake Rd. to accommodate the necessary clearance under the transmission lines. · The drainage area map and hydraulic computations will not be revised. · The drainage structures will be relocated to the new low points in the roadway. FEE ESTIMATE FOR SANDY LAKE ROAD REVISIONS 04/14/03 Number of SENIOR PROJECT DESIGN CADD TOTAL Sheets ENGR MGR ENGR TECH Sidewalk plan & profile 11 8 6 14 typical sections 4 4 9 13 quantity takeoff/sheets 1 2 6 8 specifications 4 4 cross sections 3 8 4 12 Draina.qe (~ Riverchase drainage plan & profile 1 2 4 8 14 roadway plan & profile I 4 4 8 drainage profiles 1 2 8 9 19 quantity takeoff/sheets 1 2 4 6 Storm Line vs Utility Encasement quantity takeoff/sheets 1 3 specifications 4 Pot Holes for Utilities quantity takeoff/sheets 1 3 specifications 4 Sprinkler Conduit plan & profile 11 3 4 quantity takeoff/sheets 1 2 4 HC Ramps civil details 1 3 6 plan & profile 7 2 8 6 quantity takeoff/sheets 1 2 3 specifications 4 SUBTOTAL HOURSI I I 14 I 89 I 561 96 SUB-TOTAL DESIGN COST $1,610 $7,565 $3,920 $13,098 Number of SENIOR PROJECT DESIGN CADD TOTAL Sheets ENGR MGR ENGR TECH Lower Profile of roadway plan & profile 4 4 16 10 30 drainage plan & profile 4 8 16 16 40 cross sections 8 4 16 20 40 retaining wall & culvert sheets 3 2 4 4 10 drainage profiles 1 4 16 18 38 quantity takeoff/sheets 1 1 5 6 SUBTOTAL HOURS I I I 23 I 73 1681 164 SALARYCOSTS{IncI'O/H&Pr°fitl [ I $185 I $115 I $85 I $70 I SUB-TOTAL DESIGN COST $2,645 $6,205 $4,760 $13,610 ect Administration SALARY COSTS O/H & Profit) SUB-TOTAL ADMIN COST SENIOR DESIGN TOTAL ENGR MGR ENGR 4 8 8 20 $185 $115 $85 $740 $920 $680 $2,340 TOTAL BASIC DESIGN [] $29,045 DIRECT COST = $843 TOTAL COST = ~ DIRECT COST 04/14/03 DESCRIPTION UNIT UNIT QTY TOTALS PRICE Auto Milea~te $0.34 MILE 200 $68.00 Posta~le, Couirer, Mail, etc. $50.00 MONTH 2 $100.00 Duplicating Mylar $15.00 SH~-r- ~ 25 $375.00 Prints $10.00 SHEET 25 $250.00 Copies 1 lx17 $0.10 SHEET 500 $50.00 TOTAL $843 TOTAL REIMBURSIBLES = $843