ST9301-CS030421 (2)*JACOBS
Jacobs Civil Inc.
6688 North Central Expressway
Suite 400, MB 13
Dallas, Texas 75206 U.S.A.
1.214.696.3433 Fax 1.214.696.3499
April 21,2003
City Of Coppell
255 Parkway Blvd
PO Box 9478
Coppell, TX 75019
Attention: Ken Griffin
Reference: Sandy Lake Road Design Revisions
Dear Mr. Griffin:
Jacobs is pleased to present you with our proposed fee estimate and scope of work description
for additional design work on Sandy Lake Rd.
As requested, we have shown the design fee in two parts. The first part includes just the
miscellaneous design changes. The second part includes the work to lower the profile of the
roadway to meet ONCOR's elevation requirements. Also, a separate item is shown for the
administrative time that will need to be added to whichever design option(s) is/are agreed
upon.
This fee estimate is based on our recent discussions and evaluation of the detailed scope of
work. Our fees will be billed out to the City as time & material not to exceed the total values
shown on the "Fee Estimate for Sandy Lake Rd Revisions".
Could you please forward a copy of the City of Coppell's standard contract agreement to our
office? I will make sure our legal department is reviewing it while we finalize the Scope of
Work.
I look forward to your response as to which of the design options the City would like to pursue
with Jacobs Civil Inc. Please do not hesitate to contact me at 214-424-7579.
Sincerely,
JACOBS CIVIL INC.
Debbie Kiger, P.E.
Civil Engineer
Enclosu res
Copy: Mark Goode
PF 13480-501
A Subsidiary of Jacobs Engineering Group Inc.
DESIGN SCOPE OF WORK
Sidewalk
· The sidewalk will be shown on the south side of the project.
· The grading (cross sections) will have to be revised at the right turn lane onto
Riverchase, there isn't enough flat grade there for the sidewalk.
Drainage at Riverchase
· The drainage area map and hydraulic computations will not be revised.
· The cross sections will not be revised.
· The existing drainage pipe to the south as well as a newly constructed pipe from the
east will be tied into the Sandy Lake Rd system.
Stomi line - vs - Utility Encasement
Pot Holes for Utilities
· These issues will be handled as added bid items on the quantity list.
· There will be a quantity and cost that is available for payment as deemed necessary
by the inspector & contractor.
· A description will be included in the specifications so that the work included in each
bid item is clarified.
Sprinkler Conduit/Pipes
· Jacobs will coordinate with the parks department to determine size required for the
conduit.
· Jacobs will not show the irrigation design, just the basic piping in the median.
HC Ramps
· Jacobs will include the City of Dallas Detail 25 ID in the plan set, which meets the
newest ADA standards.
· The crosswalks and median noses will be modified to meet the new ramp locations.
Lower the Profile of Sandy Lake Rd.
· After coordinating with Jon Scarborough on behalf of ONCOR, Jacobs will lower
part of the profile of Sandy Lake Rd. to accommodate the necessary clearance under
the transmission lines.
· The drainage area map and hydraulic computations will not be revised.
· The drainage structures will be relocated to the new low points in the roadway.
FEE ESTIMATE FOR SANDY LAKE ROAD REVISIONS 04/14/03
Number of SENIOR PROJECT DESIGN CADD TOTAL
Sheets ENGR MGR ENGR TECH
Sidewalk
plan & profile 11 8 6 14
typical sections 4 4 9 13
quantity takeoff/sheets 1 2 6 8
specifications 4 4
cross sections 3 8 4 12
Draina.qe (~ Riverchase
drainage plan & profile 1 2 4 8 14
roadway plan & profile I 4 4 8
drainage profiles 1 2 8 9 19
quantity takeoff/sheets 1 2 4 6
Storm Line vs Utility Encasement
quantity takeoff/sheets 1 3
specifications 4
Pot Holes for Utilities
quantity takeoff/sheets 1 3
specifications 4
Sprinkler Conduit
plan & profile 11 3 4
quantity takeoff/sheets 1 2 4
HC Ramps
civil details 1 3 6
plan & profile 7 2 8 6
quantity takeoff/sheets 1 2 3
specifications 4
SUBTOTAL HOURSI I I 14 I 89 I 561 96
SUB-TOTAL DESIGN COST $1,610 $7,565 $3,920 $13,098
Number of SENIOR PROJECT DESIGN CADD TOTAL
Sheets ENGR MGR ENGR TECH
Lower Profile of roadway
plan & profile 4 4 16 10 30
drainage plan & profile 4 8 16 16 40
cross sections 8 4 16 20 40
retaining wall & culvert sheets 3 2 4 4 10
drainage profiles 1 4 16 18 38
quantity takeoff/sheets 1 1 5 6
SUBTOTAL HOURS I I I 23 I 73 1681 164
SALARYCOSTS{IncI'O/H&Pr°fitl [ I $185 I $115 I $85 I $70 I
SUB-TOTAL DESIGN COST $2,645 $6,205 $4,760 $13,610
ect Administration
SALARY COSTS O/H & Profit)
SUB-TOTAL ADMIN COST
SENIOR DESIGN TOTAL
ENGR MGR ENGR
4 8 8 20
$185 $115 $85
$740 $920 $680 $2,340
TOTAL BASIC DESIGN [] $29,045
DIRECT COST = $843
TOTAL COST = ~
DIRECT COST 04/14/03
DESCRIPTION UNIT UNIT QTY TOTALS
PRICE
Auto Milea~te $0.34 MILE 200 $68.00
Posta~le, Couirer, Mail, etc. $50.00 MONTH 2 $100.00
Duplicating
Mylar $15.00 SH~-r- ~ 25 $375.00
Prints $10.00 SHEET 25 $250.00
Copies 1 lx17 $0.10 SHEET 500 $50.00
TOTAL $843