ST0202-EM030623$ 4
�f �flZ 95Z�SN, 3r✓�! /
Bethel School Road
(from Denton Tap Rd. to Heartz Rd.)
Project - No. ST 02 -02
UNIT PRICE BID SCHEDULE
Item
Quantity
Unit
Description and Price in Words
Unit
Total
No.
Price
Price
I -1
1
LS
Mobilization & Demobilization
Complete in Place
I S'0V"J
Dollars
and Cents
per Lump Sum.
I -2
3524
SY
Concrete Street Removal &
Disposal (including all saw cutting)
Complete in Place
t 13 40
Dollars
3s
and Cents
per Square Yard.
I -3
531
SY
Concrete Driveway Removal &
Disposal (including all saw cutting)
Complete in Place
3 s
I o 53S
Dollars
and Cents
per Square Yazd.
I -4
1
EA
20 -Foot Inlet Removal & Disposal
(including all saw cutting)
Complete in Place
2 Ooo
200
Dollars
and Cents
per Each.
I -5
1
LS
Brick Paver Removal &
Replacement
Complete in Place
3 S�
3 5 09
Dollars
and Cents
per Lump Sum.
I -6
76
SY
Sidewalk Removal & Disposal
(including all saw cutting)
n
Complete in Place
Dollars
and Cents
per Square Yard.
1 -18
16� 11
Bidding Documents
1�,, -
Bethel School Road
(from Denton Tap Rd. to Heartz Rd.)
Project - No. ST 02 -02
UNIT PRICE BID SCHEDULE
Item
Quantity
Unit
Description and Price in Words
Unit
Total
No.
Price
Price
I -7
6
EA
Tree Removal & Disposal
Complete in Place
Dollars
MOo
and Cents
per Each.
I -8
1
EA
Relocate Existing Light Pole on
Post Office site
Complete in Place
1
� bid
Dollars
and Cents
per Each.
I -9
1
EA
Lower 8" Cast Iron Water Line
Complete in Place
Dollars
Spy
25�
and Cents
per Each.
1 -10
3836
SY
7" Concrete Paving with
6" Monolithic Curb
Complete in Place
Dollars
and Cents
per Square Yard.
I -11
78
SY
8" Concrete Paving with
6" Monolithic Curb
Complete in Place
Dollars
and Cents
per Square Yard.
I -12
4465
SY
8" Cement Treated Base
Complete in Place
�
Dollars
1 � bo
and Cents
per Square Yard.
1 - 7J
1 -19 Bidding Documents
Bethel School Road
(from Denton Tap Rd. to Heartz Rd.)
Project - No. ST 02 -02
UNIT PRICE BID SCHEDULE
Item
Quantity
Unit
Description and Price in Words
Unit
Total
No.
Price
Price
1 -13
884
SY
7" Concrete Driveway with
6" Monolithic Curb
Complete in Place
Dollars
and Cents
per Square Yard.
I -14
72
SY
4" Sidewalk 5 Foot in width
Complete in Place
Dollars
and Cents
per Square Yard.
I -15
1
EA
20 -Foot Recessed In
paving for gutter tran Complete
Oc�v
in Place
Doand
Cens
per Each.
I -16
11
LF
24" Class IV RCP (including
connection to existing 24" RCP)
�
Complete in Place
S
Dollars
S S CJ
and Cents
per Linear Foot.
I -17
1
LS
Replace Pull Boxes & Install/
Replace Traffic Loops
)
5 O O
Complete in Place
Dollars
and Cents
per Lump Sum.
')1
1-20 Bidding Documents
Bethel School Road
(from Denton Tap Rd. to Heartz Rd.)
Project - No. ST 02 -02
UNIT PRICE BID SCHEDULE
u ♦ rV nrr
3 3
1 -21 Bidding Documents
u�avaL L1L
Item
Quantity
Unit
Description and Price in Words
Unit
Total
No.
Price
Price
I -18
1
LS
Furnish, Install & Maintain Traffic
Control Devices
Complete in Place
1 01000
Dollars
and Cents
per Lump Sum.
I -19
1
LS
Pipe and Bollards Around Existing
Gas Meter
Complete in Place
t Oa D
Dollars
and Cents
per Lump Sum.
I -20
441
EA
4" Double Reflective Yellow
Acrylic Round Buttons
Complete in Place
Q
1 bs
Dollars
and Cents
per Each.
I -21
104
EA
4" Single Reflection White
Acrylic Round Buttons
Complete in Place
q l�
Dollars
and Cents
per Each.
I -22
1
EA
R -10 Sign
Complete in Place
Dollars
2,po
20�
and Cents
per Each.
3 3
1 -21 Bidding Documents
Bethel School Road
(from Denton Tap Rd. to Heartz Rd.)
Project - No. ST 02 -02
UNIT PRICE BID SCHEDULE
BASE BID
Item
Quantity
Unit
Description and Price in Words
Unit
No.
Price
77[PTrnice7:
I -23
1
LS
Furnish, Install, Maintain &
Remove Erosion Control Devices
w/ SWP3 Plan
60070
b000
Complete in Place
Dollars
and Cents
- Sum-
per Lump
1-24
6
EA
Barrier Free Ramps
Complete in Place
Dollars
Soo
3 O Op
and Cents
per Each.
I -25
1
LS
Repair Irrigation
Complete in Place
Dollars
S OO p
3'00 fl
and Cents
per Lump Sum.
11,000
TOTAL BID ITEMS BASE BID I -1 thru I -25
TANGIBLE PERSONAL PROPERTY COST
$ 4 "Z)b1190
1 -22 Bidding Documents