121 BP Phase 1-CS 990107~.
L~~L=uv i
~ JAN 141999
DEVELOPMENT REVIEW
ENGINEERING COMMENTS
ITEM: One Twenty One Business Parr Renlat of Lots I and 2. Phase I Block 1 and
Site Plan Review of Lot 2. Block 1. to allow the creation of two lots, and the
development of 4 office buildings totaling 163,614 square feet on Lot 2,
located at the southwest corner of Coppell Road and Corporate Park
Boulevard, at the request of Gromatzky, Dupree and Associates, InG
DRC DATE: December 29,1998 and January 7,1999
CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENTSTATUS.• /FINAL I~~
dd IITz a-~Q~a
1. The City of Coppell Thoroughfare Plan shows the future extension of Freeport Parkway
aligned in this azea along with a collector linking this azea to Freeport Parkway. The City
recommends construction of a street through this site that would connect Corporate Park
Drive to Freeport Parkway in the future. Access to S.H. 121 when the main highway
lanes are constructed will be difficult if this access is not provided.
2. The "Overall Site Plan" on sheet A1.01 is not to scale. Provide a site plan drawn to scale
with all adjacent streets and driveways shown to scale with appropriate street names.