121 BP Phase 1-CS 990520~.
r-.
DEVELOPMENT FEE TABLE
Project: One Twenty-One Business Park Lots 1 & 2, Block 1 Replat (Phase 1)
Date: 5/20/99
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $19,125.00 $19,125.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $450.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $768.20
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $10,035.70
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $140.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $150.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $14,400.00 $14,400.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $200.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $200.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $195,845.96 $195,845.96
(100% due prior to Council Approval)
Street Light Fee Information not Ava ilable
(100 % due prior to Acceptance of Project
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project
Construction Inspection Fee Information not Available
TOTAL $241, 314.86
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $229,370.96
DEVELOPMENT FEE WORKSHEET
PROJECT: One Twenty-One Business Park Lots 1 & 2, Block 1 Replat (Phase 1)
DATE: 5/20/99
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
4 - 2 inch
2 - 2 inch
0
3 - 8 inch
= 32 ESU's
= 8 ESU's
= 0 ESU's
= 2.5 ESU's
Total #: 42.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 9 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 4 Domestic Meter(s) @ $192.05
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s) @ $192.05
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 3 Fireline Meter(s) @ $3,217.20
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 4 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 5 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 32 @ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 4 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$19,125.00
$450.00
$768.20
$384.10
$0.00
$9,651.60
$140.00
$150.00
$14,400.00
$200.00
$200.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved:
0 Single-family @ $0.00 per lot
0 Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$0.00
$o.oo
$195,845.96
Information not Available
Information not Available
Information not Available
Page 2
--~
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: One Twenty-One Business Park Lots I & 2, Block I Replat (Phase 1)
DATE: 5/20/99
RO WAY IMPACT FEE_
Service Area * 1
Category ** Office
Land Use ** General Office Bld .
Building Area (sf) 163,614
Development Units ** 163.61
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $195,845.96
* (Figure 2 -Roadway Impact Fee Study)
** (Table 3 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -Roadway Impact Fee Study)