First Baptist-CS030630Craig M. Hoenes
Kimley -Horn and Associates, Inc.
12700 Park Central Drive, Suite 1800
Dallas, TX 75251
RE: First Baptist Church of Coppell Addition
Fee Assessment Letter
Dear Mr. Hoenes:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $4,814.63 and forward
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to Council approval. Please note that the Texas Legislature,
under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a
Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2%
4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the
scheduled pre construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
Teresa M. Turner, E.I.T.
Graduate Engineer
tutYKQY
T H E •C 1 T Y •O F
COPPELL
5
cc: Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY P.O.BOX 478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673
June 30, 2003
Project: First Baptist Church of Coppell Addition
Date: 6/30/03
DEVELOPMENT FEE TABLE
TOTAL
FEES DUE
AMOUNT DUE
PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee
(100% due at Issuance of Building Permit)
$5,180.00
Water Tap Inspection Fee
(100% due at Issuance of Water Meter)
$150.00
Water Meter Fee (Domestic)
(100% due at Issuance of Water Meter)
$205.28
Water Meter Fee (Irrigation/Fireline)
(100% due at Issuance of Water Meter)
$2,297.72
Water Meter Deposit (Domestic)
(100% due at Issuance of Water Meter)
$30.00
Irrigation/Fireline Meter Deposit
(100% due at Issuance of Water Meter)
$60.00
Wastewater Impact Fee
(100% due at Issuance of Building Permit)
$2,240.00
Wastewater Tap Inspection Fee
(100% due at Issuance of Building Permit)
$50.00
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
$50.00
Park Fee
(100% due prior to Council Approval)
$0.00
$0.00
Roadway Impact Fee
'(100% due prior to Council Approval)
$4,814.63
$4,814.63
Street Light Fee
(100% due prior to Acceptance of Project)
Information not Available
11
Information not Available
Information not Available
11
Street Sign Fee
(100% due prior to Acceptance of Project)
Construction Inspection Fee
(100% due prior to Start of Construction)
TOTAL
$15,077.63
$4,814.63
I TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
Project: First Baptist Church of Coppell Addition
Date: 6/30/03
DEVELOPMENT FEE TABLE
PROJECT: First Baptist Church of Coppell Addition
DATE: 6/30/03
DEVELOPMENT FEE WORKSHEET
Water Impact Fee:
Domestic Meter(s): 1 2 inch 8 ESU's
Irrigation Meter(s): 1 2 inch 8 ESU's
0 0 ESU's
Fireline Meter(s): 1 8 inch 2.5 ESU's
Total 18.5 ESU's $280.00 ea. $5,180.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total 3 Connections $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total 1 Domestic Meter(s) $205.28
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation /Fireline Water Meter Fee:
Total 1 Irrigation Meter(s) $205.28 $205.28
Total 0 Additional Irrigation Meter(s) $0.00 $0.00
Total 1 Fireline Meter(s) $2,092.44 $2,092.44
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total 1 Meter(s) $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation /Fire Meter Deposit Fee:
Total 2 Meter(s) $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8 $280.00 ea. $2,240.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total 1 Connections $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 1 Lots $50.00 ea.
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
Preliminary plat approved: After October 26, 1993
0 Single-family $0.00 per lot
0 Multifamily $0.00 per unit
(50% paid prior to Council approval of final plat)
Page 1
$150.00
$205.28
$30.00
$60.00
$50.00
$50.00
$0.00
$0.00
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $4,814.63
Street Lighting Fees:
Assessed for lighting in the City's right -of -way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right -of -way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Information not Available
Information not Available
Information not Available
Service Area
6
Category
Institutional
Land Use
Church/Synagogue
Building Area (sf)
30,863
Development Units
30.86
Vehicle Miles per Development Unit
0.52
Fee per Vehicle Mile
$300
Roadway Impact Fee due (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile)
$4,814.63
PROJECT: First Baptist Church of Coppell Addition
DATE: 6/30/03
ROADWAY IMPACT FEE:
ROADWAY IMPACT FEE CALCULATIONS
(Figure 2 Roadway Impact Fee Study)
(Table 3 Roadway Impact Fee Study)
(Schedule 2, Page 3 Roadway Impact Fee Study)