Lakes of C 1stP-CS 860124., ti ~; s
~...
January 24, 1986
Mr. Ed Powell
City Engineer
City of Coppell
P. 0. Box 478
Coppell, Texas 75019
-~--~,
TRILAND sue. ~~, new ~`~e
Re: Lakes of Coppell DeForest Road Improvements,
Dear Mr. Powell:
Nathan Maier, Inc, design engineers for the above referenced
protect, are nearing completion of design. I would anticipate
that final design will be submitted to your office prior to
February 15, 1986.
Based on the motion drafted during the special City Council
session held January 21, 1986, the following is an estimated
contribution towards the cost of improvements of the above road.
City of Coppell 15% $ 98,316
Triland's Contribution 25% 163,860
Kenwood's Contribution 24.5% 160,845
Dimension-Brooks' Cont. 35.5% 232,420
Total 100.0% $655,441
This information is provided for budget purposes only and is
subtect to change. It is based upon the following preliminary
estimate from Nathan Maier, Inc.
Grading S 51,630
Storm sewer 141,007
Water 93,653
Paving 270,051
Retaining Wall 30,600
Utility Relocation 8,500
Engineering & Contingencies .___602.000
Total $655,441
Triland Development, InC. • One Lincoln Centre, Suite 1000 • 5400 LBJ Freeway • Dallas, Texas 75240 • (214) 934-1234 • Telex 794183
t
Mr. Ed Powell
January 24, 1986
Page 2
r. -~+
Should you have any questions concerning this matter, please do
not hesitate to call.
Si rely,
Douglas iker
Vice President/Dallas Region
cc: Frank Proctor, City Manager
Lou Duggan, Mayor
Wayne Ginn
DS/ st