Loading...
Lakes of C 1stP-CS 860124., ti ~; s ~... January 24, 1986 Mr. Ed Powell City Engineer City of Coppell P. 0. Box 478 Coppell, Texas 75019 -~--~, TRILAND sue. ~~, new ~`~e Re: Lakes of Coppell DeForest Road Improvements, Dear Mr. Powell: Nathan Maier, Inc, design engineers for the above referenced protect, are nearing completion of design. I would anticipate that final design will be submitted to your office prior to February 15, 1986. Based on the motion drafted during the special City Council session held January 21, 1986, the following is an estimated contribution towards the cost of improvements of the above road. City of Coppell 15% $ 98,316 Triland's Contribution 25% 163,860 Kenwood's Contribution 24.5% 160,845 Dimension-Brooks' Cont. 35.5% 232,420 Total 100.0% $655,441 This information is provided for budget purposes only and is subtect to change. It is based upon the following preliminary estimate from Nathan Maier, Inc. Grading S 51,630 Storm sewer 141,007 Water 93,653 Paving 270,051 Retaining Wall 30,600 Utility Relocation 8,500 Engineering & Contingencies .___602.000 Total $655,441 Triland Development, InC. • One Lincoln Centre, Suite 1000 • 5400 LBJ Freeway • Dallas, Texas 75240 • (214) 934-1234 • Telex 794183 t Mr. Ed Powell January 24, 1986 Page 2 r. -~+ Should you have any questions concerning this matter, please do not hesitate to call. Si rely, Douglas iker Vice President/Dallas Region cc: Frank Proctor, City Manager Lou Duggan, Mayor Wayne Ginn DS/ st