Loading...
Bank One-CS030702BROCKETTE •DAVIS • DRAKE, inc. consulting engineers July 2, 2003 Ms. Teresa Turner, E.I.T. City of Coppell 255 Parkway PO box 478 Coppell, Texas 75019 Re: Natches Trace Addition, Lot 1 Block A Bank One Construction Plan Review Comments BDD Project No. C02364 Dear Ms. Turner: We are returning the marked-up set and two sets of the revised plans to the City for review. We have made the following revisions andlor corrections in accordance with your comments letter dated July 1, 2003: Gradin~t Plan 1. The gutter elevation in the southeast comer of the parking lot has been provided Tzc esh (r~ Glnr SIG ~ T ~O 2• The 0.80% Swale is intended to drain toward an existing ditch which flows along Denton ~~ ~.,,\,~ p l~~ Tap Road to an wye inlet approximately 150 north of the site, and not to the curb inlet. `'` ~ '~"'~ w 3_ Spot grade elevations have been added to the driveway onto Natches Trace Drive to assure ADA compliance. Details 1. Silicone joint sealant is now shown on our plans. 2. The pavement section and subgrade have been updated. I trust that these revisions will meet your approval. Please review and contact me with any questions or further comments. Sincerely, BROCKETTE-DAVIS-DRAKE, INC. Brandon O'Donald, P.E. Project Manager Civil & Structural Engineering • Surveying 4144 North Central Expressway, Suite 1100 • Dallas, Texas 75204 (214) 824-3647 • Civil/Survey Fax (214) 824-7064 • Structural Fax (214) 824-2586