Freeport NIP(7.0)-LR030702 6300 Rothway, Ste, ]~0, Houston~ ~X ??040
' i . : Corporate Phone: (214) 630=974S
REPORT OF REINFORCING STEEL INSPECTION
CHent:
Duke Realty Services, LP
Arm: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 179431
Project No.: 037333
Date of Service: 06/28/2003
Report Date: 07/02/2003
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Reinforcing Steel Inspection
Report of InsPection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Reinforcing Steel Inspection. The results are attached.
Technician Time:
Page i of 2
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
( 1 ) Duha Realty Services, LP
(1) City of Coppdl Engineering Dept.
(1) Panbeco Koch Consulting Engineers
6:30am - 7:30am
(I) Engineering Analyst
(1) City of Coppell Bldg. Inspections
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
~ports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without thc written approval of Rone Engineers, Ltd.
99DD Pa-e 1 of 1
RoneEngineers
890~ Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Report of
Reinforcing Steel Inspection
Client: Do ~ e' Report No.:
Project No.:
Project: ~'r e epor ¢ / 0 Date of Service:
Page
Locationsandltemslnspected: 5b~4,- ~ar ~;~, la// AIov-/'A /'/~/f ~'?~'~ ~ ~ '~/~
Discrepancies/Comments:
Inspector's Signature: ~/, ~,'~Tt Time: "7"o0/~ to '7 L~ o,"%",-
Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No