Loading...
Freeport NIP(7.0)-LR030626:Rone'Eng neers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, ForfWorth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DAILY ACTIVITIES Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Linc Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Daily Activities Report No.: 179036 Project No.: 037333 Date of Service: 06/23/2003 Report Date: 06/26/2003 Report of Activities On this date, a Rone Engineers, Ltd. representative(s) was on site to monitor concrete being placed in the south parking lot. During placement, compressive strength concrete cylinders were molded. Reinforcing steel inspection was performed pior to concrete. Steel was also inspected on slab on grade between column line FF to PP between Line 3 and Line 5. Technician Time: 7:30 AM - 3:00 PM Page 1 of 1 Teehnician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineem (1) Engineering Analyst (1) City of Coppell Bldg. Inspections K. Scott Wats~ AET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conwol. Our lette~ and reports are for the exclusive use of the clients to whom they arc addressed and shall not be reproduced except in full without the written approval of R. one Engineers, Ltd. 99DF PaRe 1 of 1 RoneEn gineers 8908 Ambassador Row, DMIas,'TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF REINFORCING STEEL INSPECTION Client: Duke Realty Services, LP Attn: Mr. leffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 179037 Project No.: 037333 Date of Service: 06/23/2003 Report Date: 06/26/2003 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Reinforcing Steel Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Reinforcing Steel Inspection. The results are attached. Technician Time: 6:30 AM - 7:30 AM 3:00 PM - 4:00 PM Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) D~ke Realty Services, LP (1) Duke Realty Services, LP (t) City of Coppen Engineering Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Bldg. Inspections CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports ere for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF Page 1 of 1 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-6211 Client: Report of Reinforcing Steel Inspection Report No.: Project No.: Date of Service: Page Locations and Items Inspected: Items Inspected: Conforming Non Items Inspected: Conforming Non Items I,iip~t~: Cu.f~, =l.g Non Conforming Conforming Conformin~ Placing Drawings Bar I~ngth .~olumn Ties Properly Approved ~ and qhn,n~- ~ lied and Spaced Bar Siz£ ~ Proper Bar Placm'nent ~ Stirrup Spacing and Type Bar Grade ~ Properly Tied I~ Lapped Splices Bars Clean ~ Dowel Bm in Place ~ Welded Splices ~orm Clean ~ Proper Bar Supgotta ~ Mechanical Splices Number Bar$ ~ Proper Cover Discrepancies/Comments: Inspector's Signamre: Time: '7:0~,../~, to '7:3o~r~ Client/Contractor Signature: Client/Contractor Copied with ResultS: Yes / No Ron Engineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-6211 Client: Project: Report of Reinforcing Steel Inspection Report No.: Project No.: Date of Service: Page of Locations and Items Inspected: Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non Conforming Conforming Conforming Pla~ing Drawings Bar L~ngth Column Ties Properly Approved ~ and Sha~e ~ Tied and Sjmeed ~ Bar Siz~ ~ Proper Bar Placement ~ Stirrup Spacing and Type ~ Bar Grade ~ Properly Tied ~ Lapped Splices ~ Bara Clean ~ Dowel Barn in Place ~ Welded Splices ~ Foi-m Clean ~ Proper Bar Supports ~p~a__ ( Mechanical Splices ~ Number Bars ~ Proper Cover ~ Discrepancies / Comments: Inspector's Signature: ~'~' Time: Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No