Freeport NIP(7.0)-LR030626:Rone'Eng neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, ForfWorth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DAILY ACTIVITIES
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Linc Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Daily Activities
Report No.: 179036
Project No.: 037333
Date of Service: 06/23/2003
Report Date: 06/26/2003
Report of Activities
On this date, a Rone Engineers, Ltd. representative(s) was on site to monitor
concrete being placed in the south parking lot. During placement, compressive
strength concrete cylinders were molded. Reinforcing steel inspection was
performed pior to concrete. Steel was also inspected on slab on grade between
column line FF to PP between Line 3 and Line 5.
Technician Time: 7:30 AM - 3:00 PM
Page 1 of 1
Teehnician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Engineering Dept.
(1) Pacheco Koch Consulting Engineem
(1) Engineering Analyst
(1) City of Coppell Bldg. Inspections
K. Scott Wats~
AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conwol. Our lette~ and
reports are for the exclusive use of the clients to whom they arc addressed and shall not be reproduced except in full without the written approval of R. one Engineers, Ltd.
99DF PaRe 1 of 1
RoneEn gineers
8908 Ambassador Row, DMIas,'TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF REINFORCING STEEL INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. leffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 179037
Project No.: 037333
Date of Service: 06/23/2003
Report Date: 06/26/2003
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Reinforcing Steel Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Reinforcing Steel Inspection. The results are attached.
Technician Time: 6:30 AM - 7:30 AM
3:00 PM - 4:00 PM
Page 1 of 3
Technician: Lanny Gist
Report Distribution:
(1) D~ke Realty Services, LP
(1) Duke Realty Services, LP
(t) City of Coppen Engineering Dept.
(1) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
(1) City of Coppell Bldg. Inspections
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports ere for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DF Page 1 of 1
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Client:
Report of
Reinforcing Steel Inspection
Report No.:
Project No.:
Date of Service:
Page
Locations and Items Inspected:
Items Inspected: Conforming Non Items Inspected: Conforming Non Items I,iip~t~: Cu.f~, =l.g Non
Conforming Conforming Conformin~
Placing Drawings Bar I~ngth .~olumn Ties Properly
Approved ~ and qhn,n~- ~ lied and Spaced
Bar Siz£ ~ Proper Bar Placm'nent ~ Stirrup Spacing and Type
Bar Grade ~ Properly Tied I~ Lapped Splices
Bars Clean ~ Dowel Bm in Place ~ Welded Splices
~orm Clean ~ Proper Bar Supgotta ~ Mechanical Splices
Number Bar$ ~ Proper Cover
Discrepancies/Comments:
Inspector's Signamre:
Time: '7:0~,../~, to '7:3o~r~
Client/Contractor Signature: Client/Contractor Copied with ResultS: Yes / No
Ron Engineers
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Client:
Project:
Report of
Reinforcing Steel Inspection
Report No.:
Project No.:
Date of Service:
Page
of
Locations and Items Inspected:
Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non
Conforming Conforming Conforming
Pla~ing Drawings Bar L~ngth Column Ties Properly
Approved ~ and Sha~e ~ Tied and Sjmeed ~
Bar Siz~ ~ Proper Bar Placement ~ Stirrup Spacing and Type ~
Bar Grade ~ Properly Tied ~ Lapped Splices ~
Bara Clean ~ Dowel Barn in Place ~ Welded Splices ~
Foi-m Clean ~ Proper Bar Supports ~p~a__ ( Mechanical Splices ~
Number Bars ~ Proper Cover ~
Discrepancies / Comments:
Inspector's Signature: ~'~'
Time:
Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No