Loading...
SW0001-CS0306205w000 t J4 WEEKLY PROJECT STATUS REPORT DATE: June 16 — June 20, 2003 PROJECT NO.: CLIENT: City of Coppell BY: PROJECT: Riverchase Elementary School REVIEWED BY: 2230 - 01.148 Bradley J. Moss Steve A. Markussen Date Item 6/16 1. BJM received call from Mark Bice (Exel Foundation) and Mark explained that the bridge could not be built using the joist hangers that is specified on the plans, and the City Inspector would not allow him to omit the hangers without the Engineer's approval. BJM explained that PK will review the sidewalk detail and call him back. 6/20 1. BJM and SAM called Mark Bice to review the sidewalk detail and it was concluded that the joist hangers would not be necessary if he bolts the joists to the handrail posts. BJM sent a letter to Mark Bice explaining that PK will allow bolting the joists to the handrail posts in lieu of using joist hangers. cc: City of Coppell — Kenneth Griffin BJM /slt 2230 -38