Loading...
DR0001-CN030703CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT. CONTRACTOR: OWNER: CHANGE ORDER: DR 00 -01 MacArthur /Samuel Drainage Project SITE CONCRETE, INC. CITY OF COPPELL # ONE (1) DATE: 06130103 ADD: Item Quantity Unit Description Unit Price Total Price 1 70 LIT 15" RCP 46.00 3 2 2 Ea 15" 45- degree bend 575.00 1,150.00 3 1 Ea 2'x4' grate inlet 2 2 4 1 Ea Connection 575.00 575.00 5 80 SF Remove & Replace Existing Sidewalk 5.75 460.00 6 60 SY Remove & Replace Existing Alley 4.60 276.00 Paving Total $8,556.00 The contractor hereby accepts this contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason for this revision to the Contract. 6.3 Recommendedby City Engineer Date C %rte) 4 J z l A eed to by Contractor Date by City of Coppell Date 9723133146 06/26/2003 17:18 9723133146 SITE CONRETE PAGE 01/01 3340 Roy Orr Boulevard, Grand Prairie, Texas 75050 Office 972.313 -0733 Fax 972- 313 -3146 Site Concrete, Inc. I =NrtA - To: Rick Odell — C ty of Coppell From: Melissa Uselding Fax: 972 - 304 -3673 Pages: 1 Phone: Date: 6126/03 Re: MacArthur & Samual Drainage CC: ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle • Comments: Mr. Odell: The following is the pricing you requested for the additional work required on the above referenced project: 15" RCP 70 LF $ 46.00 $ 3,220.00 15' 45-degree Bend 2 EA $ 575.00 $ 1,150.00 2 x 4 Grate Inlet 1 EA $ 2,875.00 $ 2,875.00 Connection 1 EA $ 575.00 $ 575.00 Remove & Replace Existing Sidewalk 80 SF $ 5.75 $ 460.00 Remove & Replace Existing Alley Paving 60 SY $ 4.60 $ 27600 $ 8,556.00 Should you have any questions or require additional information, please contact me at your earliest convenience.