Parks Coppell ABQ-CS 900202Febrtaary 2, 1990
.n~~yy~
Mr. Russel fit.
City Engi er
P. O. Bo 478
Coppell, Texas
Doyle, P.E.
75019
/- 6 - ~~;
s ~w ~-~ ~=~`1 ~" ~ A1~~1Development
~~ ~ ~ Y^
{,~~.
ABQ Development Corporatio _
625 Si ver SW
Suite 200
Po Bex 2sszs
AlbuquerGUe, NM 87125
Tei 505 242 3330
RE: Town Center Area Development Plans
Dear Russell:
In response to your letter dated January 29, 1990, ABQ
presently has no plans for the referenced channel. ABQ will not
deve:top any improvement plans for the channel until an "end user"
is i=t place for the land adjacent to the channel. The
improvements that are planned along with the Heartz Road
construction are interim.
The "conceptual design" approved via an agreement with the
Parkes of Coppell Joint Venture II is that, a conceptual approval.
When the channel improvement plans are developed they will be in
comp''.iance with the existing City standards and ordinances at
that time.
I understand that the "Pecan Hollow" development may have
runo,=f draining into the channel. Please take notice that the
channel at this time is private and any drainage entering the
channel must be via an easement. I do not believe the City has
the :-fight to approve public runoff draining into a private
chanziel without an agreement with the owner. This was not done
with the Warren Clarke tract which now drains into the channel.
Please let Jerry Parche' of Jerry Parche' Consulting
Engir-eers, or ABQ know if there is runoff draining into the
channel. We will need to analyze the situation to see if there
are any downstream improvements needed.
Sind?rely,
Jay .~. Chester, P.E.
Proj. act Manager
,:.
~/~ ' ..
J
FES - 7 Aso
Ll'