Loading...
Assured Self-CS030703W ~ ~. c ~ ~~~ ,_ _ ~ ~ f' r '~F ~:~1:, ~`i ~n1nII~;~,l~ )~;' +: ~~ 1';i~V[f~t~^ ~~E;~''3''~.P, ~~L'~~Li"1'Y July 3, 2003 Yis. Teresa Turner p.O. Sox 94"7R Coppcll, TX 75019 RE: Complaint No. 21034 Dear Ms. Turner: The Texas Commission on Environmental Quality (TCEQ) appreciates your interest in the above referenced matter. Your involvement is valuable in assisting the TCEQ in its efforts to protect the State's water resources. Our investigation has been completed and the results are attached for your information. [f you have additional questions or concerns, please contact 'vls. Dcann Russey of my staff at (8l 7) 588-5896. Sincerely, .:, ~_ ., 1: i ~~ std stocum Manager, Water Section DFW Region Office SS/dr Attachment ,.. (.~.... 'f • L. :.1AI~]. 176. ~ ~'!!I'f ~~'^It'I I!, ~~~'.AA.` inl l~ hyi] • ~) '~h5-:i £i1111 • ~~.A`, `i i,V;i,~~INI i i;, ,LFi • \i.i:~~ . ~fi~~a: , ~~ ! 1-.;n.6; • ..._. '3S~ ln~iii • In(Un~~l ~rt~,i1.~ tcA~'~~.I~ cq.~Yar.ttJ.~,< STW-GC/057/05/02/03 Texas Commission on Environmental Quality Investigation Report ASSURED SELF STORAGE ASSURED SELF STORAGE RN103143822 Investigation # 60523 Incident # 21034 Investigator: DEANN RUSSEY Site Classification CONSTRUCTION GENERAL PERMIT FOR STORMWATER Conducted: 05/02!2003 -- 05!02/2003 Proaramis): STORMWATER Investigation Type : Compliance Investigation Additional ID(s) Address: 1751 E BELTLINE RD; Activity Type COPPELL, TX 75019 No Industry Code Assigned Location SW RECON -Reconnaissance investigation for entity subject to stormwater requirements Principal(s) Role Name RESPONDENT Contacts Role Participated in Investigation Participated in Investigation Regulated Entity Contact Participated in Investigation Other Staff Member(s) Role ASSURED SELF STORAGE Title Name MR PAUL PHY CONSTRUCTION MR RICK O'DELL INSPECTOR OWNER MR DON VALK MR RON VALK Name ASSOCIATE INVESTIGATOR CHRISTOPHER ISBELL SUPERVISOR JEFF TATE QA REVIEWER JEFF TATE Phone Work (214) 691 -9448 Work (972) 304 -7090 Other (972) 471 -2251 Work (972) 230 -2626 Cell (214) 668 -6907 Work (972) 230 -2626 Associated Check List Checklist Name Unit Name WO INVESTIGATION TYPES Assured Storage- Recon STORMWATER CONSTRUCTION RECON CHECKL AssurStorage-RECON ASSURED SELF STORAGE - COPPELL 512103 Page 2 of 3 Investigation Comments This reconnaissance investigation was conducted in response to a storm water complaint taken by the Storm Water Investigator on March 17, 2003. Ms. Deann Russey, Mr. Shane Isbell, both Storm Water Investigators for the TCEQ-Region 4 office, and Ms. Melinda Houlihan of the SBLGA program visited the site located at 1751 E. Beltline in Coppell, TX on May 2, 2003. The Project Manager, Mr. Ron Valk of Assured Self Storage, was on site and was able to provide all the necessary information to the investigator. Assured Self Storage was the only permitted operator at the time of the investigation. Upon arriving at 10:OOam on May 5, 2003, Ms. Russey found that the area disturbed was under, but close to 5 acres. The area had already been cleared with the topsoil exposed, however, no silt fencing was in place. Mr. Ron Valk explained that the silt fencing was being installed that day. Mr. Valk stated that the Storm Water Pollution Prevention Plan (SWPPP) was at the main office. Ms. Russey viewed the part of the SWPPP that was available, and the Best Management Practices's (BMP's) outlined in this material were not being implemented in the time frame specified. There was no Construction Site Notice posted anywhere on the site. Ms. Russey explained the Areas of Concern, including: - Construction Site Notice is not posted. - BMP's are not being implemented prior to commencing construction activity. In the complaint taken on March 17, 2003, it was stated that the construction project was surrounded by a floodplain, and dirt from the project was being piled inside the floodplain's boundary. Mr. Rick O'Dell, Construction Inspector for the City of Coppell, arrived at the site during the investigation and further expressed concern with Ms. Russey that Assured Self Storage was not complying with city or state regulations. Mr. O'Dell provided contact information for Mr. Paul Phy with the Irving Floodplain Control District. Ms. Russey contacted Mr. Phy on Thursday, May 8, 2003, and found that at the time the complaint had been called in, overburden from Assured Self Storage's construction project was in the floodplain. This was a violation of the company's approval from the City of Coppell and the Irving Floodplain Control District, and so the approval was revoked. Since that time, Assured Self Storage has removed the overburden from the floodplain and has been allowed to proceed construction. The TCEQ will send Assured Self Storage a certified letter and attach a Summary of Investigation Findings describing the Areas of Concern mentioned above. The company will have 30 days upon reciept of the letter to demonstrate compliance. If it is not shown that corrective action has been taken, these Areas of Concern will be issued as violations. ,. - _ ~~. a a_ Areas of Concern Description Additional Comments For small construction sites: Is there a At the time of the investigation, no construction site completed site notice posted and is it easy to notice was posted. A notice may be found as an see? CGP Part Part II Section D(2) attachment (Attachment 2) to the TPDES General Permit TXR150000. To demonstrate compliance on this item, please send a photograph that shows the posted notice on the construction site. Does the facility have an SWP3 developed At the time of the investigation, the SWPPP was not an implemented? CGP, Part III, Section A being implemented in the time frames necessary. No silt fencing was installed prior to commencing ASSURED SELF STORAGE - 512103 " Page 3 of 3 construction activities. In order to demonstrate compliance, show in photographs and/or state in a narrative how Assured Self Storage is implementing the SWPPP. Signed ~- Date ~ I ! n3 Environme tal Investi or Signed ~~ Date / - Supervisor Attachments: (in order of final report submittal) -Enforcement Action Request (EAR) -Maps, Plans, Sketches -Letter to Facility (specify type) Investigation Report Sample Analysis Results -Photographs -Correspondence from the facility -Other (specify) Manifests NOR C~Op~(