ST0003-EM030604PRE - CONTRACT OPINION OF PROBABLE CONSTRUCTION COSTS Ht If I t LS,UARS COPPELL ROAD - COOPER LANE TO SANDY LAKE ROAD COPPELL, TEXAS - JUNE 4, 2003 ONE -WAY TRAFFIC DURING CONSTRUCTION ST0003 ITEM UNIT PROBABLE NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST PAVING IMPROVEMENTS 1 PREPARING ROW STA 35 $1,000.00 $35,000 2 BARRICADES AND TRAFFIC CONTROL LS 1 $15,000.00 $15,000 3 REMOVE EX. CONC. PAVEMENT SY 1,380 $5.00 $6,900 4 UNCLASSIFIED STREET EXCAVATION CY 12,700 $5.00 $63,500 5 SELECT BORROW MATERIAL FOR TOPSOIL CY 1,530 1 $10.00 $15,300 6 REMOVE CONC. SIDEWALK SF 4,850 $0.50 $2,425 7 4 INCH THICK REINF. CONC. WALK SF 14,516 $3.00 $43,548 8 6 INCH THICK REINF. CONC. HIKE & BIKE TRAIL SF 31,880 $3.50 $111,580 9 6 INCH THICK REINF. CONC. DRIVE SY 160 $25.00 $4,000 10 6 INCH HIGH CONC. INTEGRAL CURB LF 6,500 $1.00 $6,500 11 8 INCH THICK REINF. CONC. PAVEMENT SY 16,320 $23.00 $375,360 12 R.C. ALLEY PAVEMENT SY 30 $25.00 1 $750 13 REINFORCED CONCRETE STREET HEADER LF 500 $10.00 $5,000 14 HOT MIX FOR TEMPORARY PAVING TON 640 $50.00 $32,000 15 LIME STABILIZED SUBGRADE SY 17,080 $1.50 $25,620 16 HYDRATED LIME TON 300 $90.00 $27,000 17 6" THK FLEX BASE FOR DRIVEWAY MAINTENANCE SY 430 $10.00 $4,300 18 BLOCK SODDING SY 3,500 $3.00 $10,500 19 6" REINF. CONC. BARRIER FREE RAMP SF 1,344 $4.00 $5,376 20 4 IN NON - REFLEC TRAFFIC BUTTON EA 60 $3.00 $180 21 4 IN REFLEC TRAFFIC BUTTON TYPE II -A -A EA 90 $6.00 $540 22 4 IN THERMOPLASTIC LANE MARKER YELLOW LF 7,000 $0.50 $3,500 23 4 IN THERMOPLASTIC LANE MARKER WHITE LF 300 $0.50 $150 24 18 IN THERMOPLASTIC STOP LINE MARKER LF 200 $6.00 $1,200 25 6 IN THERMOPLASTIC CROSSWALK MARKER LF 150 $1.00 $150 26 24 IN THERMOPLASTIC CROSSWALK MARKER LF 55 $8.00 $440 27 THERMOPLASTIC ADVISORY MARKER EA 2 $500.00 $1,000 28 ADJUST 1" WATER METER & BOX EA 15 $260.00 $3,900 29 ADJUST WATER VALVE COVER & VALVE STACK EA 15 $200.00 $3,000 30 ADJUST WASTEWATER MANHOLE (24" LID) EA 7 $450.00 $3,150 31 IRRIGATION MODIFICATIONS LS 1 $10,000.00 $10,000 PAVING TOTAL $816,869 619103 1:20 PM PRE - CONTRAST OPINION OF PROBABLE CONSTRUCTION COSTS COPPELL ROAD - COOPER LANE TO SANDY LAKE ROAD COPPELL, TEXAS - JUNE 4, 2003 Ht liff-AILARS ITEM UNIT PROBABLE NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST DRAINAGE IMPROVEMENTS 33 18 INCH CLASS III REINF. CONC. PIPE LF 200 $40.00 $8,000 34 121 INCH CLASS III REINF. CONC. PIPE LF 300 $45.00 $13,500 35 124 INCH CLASS III REINF. CONC. PIPE LF 1,600 $50.00 $80,000 36 130 INCH CLASS III REINF. CONC. PIPE LF 450 $65.00 $29,250 37 142 INCH CLASS III REINF. CONC. PIPE LF 350 $105.00 $36,750 38 148 INCH CLASS III REINF. CONC. PIPE LF 1,100 $125.00 $137,500 39 160 INCH CLASS III REINF. CONC. PIPE LF 300 $175.00 $52,500 40 110 FOOT INLET EA 10 $2,200.00 $22,000 41 114 FOOT INLET EA 20 $3,000.00 $60,000 42 16 FOOT MANHOLE EA 4 $5,000.00 $20,000 43 REINF. CONC. FOR PIPE HEADWALL CY 6 $350.00 1 $2,100 44 REMOVE DRIVE CULVERT LF 300 $8.00 $2,400 45 TRENCH SAFETY LF 4,300 $1.00 $4,300 46 EROSION CONTROL LS 1 $10,000.00 $10,000 DRAINAGE TOTAL $478,300 PROJECT SUBTOTAL 15 % CONTINGENCIES PROJECT TOTAL $1,295,169 $194,275 $1,489,444 6/9103 1:20 PM