Loading...
ST9304-AG030624St 17 3 - 0� " ` - ` ' ' DEPT: Engineering /Public Works AGENDA REQUEST FORM COPPELL ,� �� - * .� DATE: June 24, 2003 " ^ a ITEM #: 8/B ITEM CAPTION: Consider approval of City of Coppell Change Order #1 to the Belt Line Road Project #ST 93 -04 in the amount of 598,628.20 as provided for in CIP Funds; and authorizing the City Manager to sign. APPROVED BY CITY COUNCIL ON ABOVE DATE GOAL(S): ' IL M , ;r 0 EXECUTIVE SUMMARY: Motion to Approve M - Peters S - Brancheau Vote - 6 -0 York absent Approval of this change order will allow the final payment for the traffic signal at Belt Line Rd. and Mockingbird Ln. to be made. Staff will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: Funds for this contract have been allocated from intere t earnings in the Street CIP accounts. Digitaly DN cn s gneb by r DM1 cn =Jm DIR. REVIEW: FIN. REVIEW: ° CM REVIEW: 1 �m I tt at SO m Upell, W 2 -DS Date. s3 200 t9 om 5 rbiu 16.3J.01 1 „ 0500 Agenda Request Fomi - Revised 09102 Document Name: tineltLineRd- IAgenda MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Kenneth M. Griffin, P.E., Director of Engineering/Public Works Date: June 24, 2003 RE: Consider approval of City of Coppell Change Order #1 to the Belt Line Road Project #ST 93 -04 in the amount of $98,628.20 as provided for in CIP funds; and authorizing the City Manager to sign. In July 2000, City Council approved a Supplemental City /County Agreement between the City of Coppell and Dallas County for the City's portion of the funding of Belt Line Road in the amount of $344,262. At the time the project was bid by Dallas County they were still in the process of designing traffic signals for the intersections of Mockingbird and Moore with Belt Line Road. My agenda item on July 25, 2000 stated that at some point in the future there would be a change order brought forth to provide for the funding of a permanent traffic signal at the Belt Line /Mockingbird intersection. The traffic signal at the intersection of Moore and Belt Line Rd. lies within the City of Dallas and that cost was paid by the City of Dallas. The Belt Line Road project is nearing completion with final punchlist items being corrected. To make the final payment on this project, a change order needs to be executed to allow the final payment to include the traffic signal at Belt Line Rd. and Mockingbird Ln. Because the traffic signal was part of a larger project, the unit cost is about 20 to 25 percent less than what we typically are charged for a traffic signal installation as a stand -alone project. The traffic signal at Mockingbird Lane was constructed at a cost of $98,628.20. When the final quantities for this project were agreed upon by all parties, the final total cost to the City of Coppell will be $448,367.82. As a point of reference, the entire project cost $6,906,350.34. Our total cost for the construction of Belt Line Road (from Denton Tap to MacArthur) was only 6.5% of the entire project cost. Staff recommends approval of Change Order #1 for the payment of the traffic signal at the Belt Line /Mockingbird intersection. Staff will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Belt Line Road Project #ST 93 -04 CONTRACTOR: Dallas Cowity OWNER: City of Copped CHANGE ORDER NO.: One (1) DATE: June 13, 2003 Item Description Quantity Unit Unit Price Total ADD: 680 Traffic Signal at 1 LS $98,628.20 $98,628.20 Mocldngbird Total Revision to Contract Amount $98,628.20 Previous contract amount Net increase in contract amount Revised contract amount $344,262.00 $98,628.20 $442,890.20 The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and Arture liability originating under any clause in the Contract by reason of this revision to the Contract. Recommende bl City Engineer Date 71 ' S� Approve Jim ' Vitt, City Manager Date