Loading...
Sandy Lake Med-CS030707Plaza - act" MEMORANDUM OF MEETING L I 1 r� Date: July 7 2003 Project: Coppell Medical Office Building Project No: 1525 Present: Representing (CCP) City of Coppell Planning Gary Sieb Marcie Diamond Representing (CCE) City of Coppell Engineering Teresa Turner Representing (CCB) City of Coppell Building Inspections Greg Jones Representing (GSR) GSR Andrade Architects Mark Diaz Representing (BDD) Brockette Davis Drake Engineers Brandon O Donald Not Present: Representing (ONC) Oncor Gas and Utilities Jeff Curry Representing (CCF) City of Coppell Fire Administration Travis Crump Representing (CCR) City of Coppell Parks and Recreation Representing (LDG) Leeming Design Group Bill Leeming Representing (DFW) DFW Consulting Group Inc. Pat Lechtenburg Location: City of Coppell Town center Purpose: Development Review Comment meeting 7/7/03 4121 COMMERCE STREET SUITE ONE I DALLAS, TEXAS 75226 1 T. (214)824 -7040 1 F. (214)887 - 0559 1 www.GSR ANDRADE.COM Discussion: The object of the meeting was to discuss the development review committee (DRC) comments for the Sandy Lake Plaza medical office building. The (DRC) panel went through the list item by item to ensure that the revised drawings have addressed all issues. GSR and BDD confirmed that all items and comments have been incorporated and or added into the revised set of drawings with the following exceptions noted below. Site plan /Plat comments: Engineering: CCE reviewed the site plan on 6/26/03 and had the following comments: Verify that you can encroach into the 15' easement along the west side of the building. a. BDD has received a verbal agreement with the leaseholder that will allow parking to encroach into the overhead easement. However BDD has been told that the project will not be allowed to have new trees planted in the easement. b. LDG has provided new trees in the landscape buffer within the overhead easement as required by the landscaping ordinance. c. CCP has stated that perhaps the existing hackberry trees currently under the overhead easement can be kept instead of mitigating them and adding new trees. CCP also stated that other developments in Coppell have had new trees planted under overhead lines and easements. CCP will look at the existing trees before making a judgement on this issue. GSR has been told to continue the submittal process; the tree issue at the easement would be kept as a condition to the approval. Planning: CCP reviewed the plat on 6/23/03 and had the following comments: Please provide staff with a copy of the Sandy Lake Plaza Addition lots 1 -3 as recorded in Volume 86235, Page 6432. Upon further research by BDD at the City of Coppell it was agreed by BDD and CCP that the plat for this project would be considered a minor plat and not a replat. Lots 1, 2 and 3 of the Block 1 Sandy Lake Plaza have never been platted, it was always an unplatted block. This project will entail BDD to plat the site as a minor plat to the existing development. Building Inspections GSR asked CCB about the building code requirements for the required number of toilets for the shell - building portion of the project. CCB said that the medical doctor toilets could be counted toward the number required for the project. GSR also wanted to clarify the requirements and or ability to have an open stairway for the project. CCB said that with a total sprinklered building with only 2 levels an open stairway is allowed for buildings. Next Submission: The next submission of the appropriate number of drawing copies and electronic files will be submitted to CCP by 12:00 noon on July 8` End of Meeting This report is intended to be a true and accurate account of the events of this meeting. Any discrepancies to and or corrections to this report should be reported to this office immediately for distribution. Submitted by, Mark Diaz Project Coordinator GSR Andrade Architects, Inc. cc: All listed as present above Allison Teague The Cirrus Group