Loading...
PA9702-LR 990811CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/09/1999 Report No.: 9918701 Report Date 08/11/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co 11 Project: Coppcll Aquatic/Recreation Ctr 732 DeForest 300 Block of Parkway Blvd Coppcll TX 75019 Coppcll, Tcxas/Prj. #9605 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & p`ssoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Rcdi-Mix PLACEMENTDATE: 07/09/1999 BATCHTI/~IE: 4:02am PLANT: 1 TI~V~E SA~IPLED: 4:43am BY: Brian Otis SPECIFICATION REQUIREIVIENTS WEATHER CONDITIONS: Clear, rt~lc~ STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 78 F CONCRETE: 88 F SLLrlVIP: 5.0*' K4ax TRUCK NO: 220 TICKET NO: 74(~69 AIR: 3-6% AIRCONTENT(~): 2.0 UNITYVEIGHT(pc~: TEST METHOD: P`ST~.V[ C- 143 PLACEIVIENT LOCATION: Paving parking lot ASTM C-172 P`STrV~ C-39 (scc attached sketch) SAMPLE LOCATION: Scc placement location REPORT OF TESTS ACCVMV TtVE YAnOS: 60 CYLINDER MEASURED ~ COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.50 07/16/1999 7 124350 4400 1 2 5.50 07/16/1999 7 122780 4340 Avenge 4370 1 3 5.50 08/06/1999 28 156690 5540 I 4 5.50 08/06/1999 28 148700 5260 Avenge S400 No~ze: Contzractzor was notj_£~_ed o£ ].ow aj-r, concre~ze pJ. ant was ca].].ed. Conc~cef;e was p3.aced b~, p~unp, sar~p3. e was ~aken ~o~n poj. n~ o£ d~.scha~Ie. This report is exclusively for the use of the client indicated above and shaft not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpente~ Frwy., Suite #100 Dallas, Tey, as 75247 Date of Service: 07/09/1999 Report No.: 9918701 Report Date 08/1 Client ~o.: COPP~L~ Proj~t~o.: ~4~111~ Client: City of Co p~ll P~oj~t: Cop~ll Aquafic~ation C~ ARn: Bn~R~id ~Bl~o~Pa~ayBl~d CO~CTOR: HiSaw ~ ASS~. CONC~ CLASS: ~ CONC~ESUPPL~R: E~di-~ix PLAC~DA~: 07/0~/1~ BATCH~: PLA~: 1 T~ SAILED: 6: 10a~ BY: Brian Otis SPECIFICATION ~UI~ $'l'~R CO~fflONS: Cle~, ~ld S~NG~: 45 psi ~ 28 Days ~E~m ~- Am 80 E COSC~'a'~: 86 SLY: 5.0" Max ~UCKSO: 218 T~C~NO: 74679 Am: 3-6% AmCO~(%): 3.0 UNff~G~(~: N/A TEST ~OD: ASTM C-143 P~C~ ~CA~ON: ~e page 1 AS~ C-172 ASTM C-39 SABLE LOCATION: See page 1 REPORT OF STS ACCSAmVA : 160 CYLSER ~ASU~D ~$ CO~S~ ~$ SL~P DAE AGE ~AD 85G~ FM~ SET NO. (Meh~) ~TED (days) (1~ f~) (~) 2 1 6.~ 07/16/1999 7 121030 4280 2 2 6.~ 07/16/1999 7 118450 4190 Avenge 4~ 2 3 6.~ 08/~/1999 28 161420 5710 2 4 6.~ 08/~/1999 28 161230 57~ Avenge 5710 Note: Tzuck was s~ped by fie~d tee~c~an, w~ter was added (1S ~allons) b~ psp operaCot, sampZe taken form p~p ~ruck, a~so notified of 3 percent a~r. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite gl00 Dalla% Texas 75247 Date of Service: 07/09/1999 Report No.: 9918701 Report Date 08/11/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~PReid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~~cati~ns~perf~rmrequired~e~dtestandcast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Redi-Mix pLACEMENTDATE: 07/09/1999 BATCH TIME: 7:32am PLANT: I TIME SAMpLED: 8:00alll BY: Brian Otis SPECIfiCATION REQUIREIVlENTS WEATHER cosornorqs: Clear, mild STnENGXH: 4000 psi @ 28 Days TEMpERATORE (v) - Am 80 F CONCR~-a'~: 86 F SLt~e: 5.0" Max TRUCK NO: 220 TICKET NO: 74699 AIR: 3-6% AreCONTENT(%): 3.5 tn~rWEionT(pcf): N/A TEST METhOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMpLE LOCATION: See page 1 REPORT OF TESTS ACetrundlE VAnl0S: 270 CYLINDER MEASURED MAXIMUM COMpRESSlYE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (daD) (Ibs. force) (psi) TYPE 3 I 6.00 07/16/1999 7 104500 3700 3 2 6.00 07/16/1999 7 101890 3600 Average 3650 3 3 6.00 08/06/1999 28 123100 4350 3 4 6.00 08/06/1999 28 126470 4470 Avenge 4410 Not:e: Truck was slumped b~, £j. e3. d t:echnj. cS. an, 10 9*allons of watzer added at: pump by pump operat:or. Saznp3. e was tzaken £x'om ptLrnp t:ruck. This report is exclusively for the use of the client indicat~t above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #1O0 Dallas, Texas 75247 Date of Service: 07/09/1999 Report No.: 9918701 Report Date 08/11/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~Reid 300 Block of Parkway Blvd 732 DeForest Coppell 'IX 75019 Coppell, Texas/Prj. ~t96051 Services: Obtainsamp~es~ffr~shc~ncr~tcatth~p~ac~ment~ocati~ns~pe~rmrequired~dtestandcast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE C~ASS: 6 Sack CONCRETE SUPPLIER: Redi-Mix pLACEMENTDATE: 07/09/1999 BATCH TIME: 8'.40am PLANT: I TIME SAMpLED: 9:50alIl BY: Brian Otis SPECIFICATION REQUIREMENTS WEATHER CoNnrrloNs: Clear, mild STRENGTH: 4000 psi @ 28 Days TEMpERAVtn~ ~ - Am 89 F COSCagTg: 88 V SLtr~W: 5.0" Max Tm~CKNO: 207 T~Cr, XTNO: 74713 AIR: 3-6% AIRCONTENT(%): 3.4 trsrrwEIGn'r(pct): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See page I REPORT OF TESTS Acctn n A VARES: 390 CYLINDER MEASURED MAXIMUM COMpRESSIVE MARKED SLUMP DATE AGE LOAD STRI~GTH FRACTURE SET NO. (inches) TESTED (days) 0bs. force) (psi) TYPE 4 1 6.00 07/16/1999 7 93180 3300 4 2 6.00 07/16/1999 7 103240 3650 Average 3480 4 3 6.00 08/06/1999 28 119470 4220 4 4 6.00 08/06/1999 28 123140 4350 Average 4290 Sample was taken from pump truck, no water was added to this load on jobsite. Teelmician: Brian Otis StaRed: 3:00am Finished: 12:30pm ~ E~ng, Inc. Report Distribution: (1) City of Coppell (l) City ofCoppell - Engineering (l) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. lnsp. (I)TumerEngineers (l)CityofCoppall-LeisureServDcpt ? EugeneHarbour Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval Of HBC Engineering, Inc. 0ILL Page 4 of 4 ,% - i I .... i.~., :':' I i ..... i_, _.._1 .~.._1 t i -- ~-I I I I ! t !. I ! I I I ! ! I ( I