Loading...
Bank One-CS030721 (2)BROCKETTE •DAVIS • DRAKE, inc. consulting engineers July 21, 2003 Ms. Teresa Turner, E.I.T. City of Coppell 255 Parkway PO box 478 Coppell, Texas 75019 Re: Natches Trace Addition, Lot 1 Block A Bank One Construction Plan Review Comments BDD Project No. C02364 Dear Ms. Turner: We are returning the marked-up set and three sets of the revised plans to the City for the City Engineer's stamp. Additional sets to be stamped for the contractor are to follow later today. We have made the following revisions andlor corrections in accordance with your comments letter dated July 15, 2003: Cover Sheet The spelling of Clarinda Squires Survey has been corrected. Gradins~ Plan 1. The wye inlet is now shown on our plans. Additionally we have revised our plans based on the redline mark-up included with your comments letter. I trust that these revisions will meet your approval. Please review and contact me with any questions or further comments. Sincerely, BROCKETTE-DAVIS-DRAKE, INC. Brandon O' Donald, P.E. Civil & Structural Engineering • Surveying 4144 North Central Expressway, Suite 1100 • Dallas, Texas 75204 (214) 824-3647 Civil/Survey Fax (214) 824-7064 Structural Fax (214) 824-2586