Bank One-CS030721 (2)BROCKETTE •DAVIS • DRAKE, inc.
consulting engineers
July 21, 2003
Ms. Teresa Turner, E.I.T.
City of Coppell
255 Parkway
PO box 478
Coppell, Texas 75019
Re: Natches Trace Addition, Lot 1 Block A
Bank One
Construction Plan Review Comments
BDD Project No. C02364
Dear Ms. Turner:
We are returning the marked-up set and three sets of the revised plans to the City for the City Engineer's
stamp. Additional sets to be stamped for the contractor are to follow later today. We have made the
following revisions andlor corrections in accordance with your comments letter dated July 15, 2003:
Cover Sheet
The spelling of Clarinda Squires Survey has been corrected.
Gradins~ Plan
1. The wye inlet is now shown on our plans.
Additionally we have revised our plans based on the redline mark-up included with your comments letter.
I trust that these revisions will meet your approval. Please review and contact me with any questions or
further comments.
Sincerely,
BROCKETTE-DAVIS-DRAKE, INC.
Brandon O' Donald, P.E.
Civil & Structural Engineering • Surveying
4144 North Central Expressway, Suite 1100 • Dallas, Texas 75204
(214) 824-3647 Civil/Survey Fax (214) 824-7064 Structural Fax (214) 824-2586