Loading...
Champions-CS030721T H E C 1 T Y O F ENGINEERING DEPARTMENT P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 FAX COVER SHEET C~/~ptP/~~oNS SCt-+~~a L To: PA ~ 1~-II.K S~ ~ t ~~ Cn ~l, ~ From: ~, fl ~ IV D Fax: 2 b I y~~ -1 6 ~f 3 Date: ~~ 2. I I ~ 3 Phone,:1 Pages: ~ (including cover sheet) Re: M _ ~ 0 ~ D S CC: ^ Urgent ^For Review ^ Please Comment ^ Please Reply ~As Requested •Comments: Patrick -here is a brief synopsis of the maintenance bond requirement. I am also including a copy from the Subdivision Ordinance of the section that covers maintenance bonds and a copy of a generic bond form. A maintenance bond equal to 50% of the contract value of all work done in the City right-of--way and easements is required prior to final acceptance. Such work would include but is not limited to: domestic water service, irrigation meter, ADA ramps, sidewalks, drive approaches, storm drains and sanitary sewer facilities. The bond must be underwritten by a registered bonding agency licensed in the state of Texas, and must be written for two years in duration, be~inninE upon the date of final acceptance of said facilities. This bond will be due to the Engineering Department on the date of final walk-through inspection. Also, the as-built plans for the project must be provided from the engineer of record at that time. Enclosed for your review or use is a copy of a generic Maintenance Bond form. You may use this bond form or provide one from a surety. In either case, a licensed surety-bonding agency must seal the bond.