Callahan-CS030722T M E C I T Y O F
COPPELL
r o
~ x A s , 9 9
July 22, 2003
Frank Pendergrass
Bonner Associates
737 S RL Thornton Fwy
Dallas, TX 75203
RE: Callahan Medical Center
Final Walk-thru
Dear Frank:
Please be advised that awalk-through is scheduled for Friday, July 25th at 9:00 a. m. for the water,
sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities aze clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please call
972-304-7090 at your earliest convenience.
Sin~ely,,~
D/!J/ ~
Rick O'Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972)304-3570
cc: Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Walter J. Nelson, P. E. fax 817-265-0206
Bonner Associates fax 214-946-1166
C3 Constructors fax 214-441-1321