Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST9302-CS 941103 (2)
11/03194 NORTH LAKE - COPPELL 138 KV LINE ROUTING OPTIONS ROUTE OPTIONS Units 1 2 3 4 5 6 7 8 House Removed ea 0 0 0 0 0 0 0 4 House w/in 200' ea 8 8 8 7 7 7 16 36 Business w/in 200' ea 2 2 2 2 2 2 10 10 Antennae w/in 500' ea 0 0 0 0 0 0 0 0 CreekJBottomland Hardwood crossed ft 1000 1000 1000 1000 1000 1000 0 400 Non-parallel segments crossed ft 700 700 0 400 700 1300 0 0 Frontage taken ft 4000 4000 4000 4000 4000 4000 400 300 HistoricallArcheologic Sites w/in 1000' ea 0 0 0 0 1 0 0 0 Recreation Area w/in 1000' ea 3 3 3 3 3 3 0 0 High Visual Impact crossed ft 9100 6700 6700 4500 5900 5900 5500 6600 Number of Angle Structures ea 10 5 6 5 4 5 3 4 Low Visual Impact crossed ft 10700 11000 9000 7900 5500 5500 2400 5400 Existing Transmission Corridor ft 1300 1300 1300 1300 1300 1300 0 0 Right-of-wayrequired ac 33.68 34.16 30.94 30.92 27.67 27.67 19.98 26.84 Length ft 19800 17700 15700 12400 11400 11400 7900 12000 Cost $k 3,337 3,000 3,039 2,744 2,602 2,681 2,289 2,554 Route Segments as follows: Route 1 - Segments A+B+C+E+P+Q Route 2 - Segments A+B+C+D+P+Q Routs 3 - Segments A+B+F+H+L+M+P+Q Route 4 - Segments A+B+F+H+L+N+Q Route 5 - Segments A+B+F+H+J+K Routs 6 - Segments A+B+F+G+K Route 7 - Segments V+W Route 8 - Segments V+X NOTES: 1) All abov~ tOUtC, f must have ScBmcaLs R+S+U (14,~0') or R+T+U (14,400') add¢~t to complete project. 2) CoMa aad acreage abovc iacludc thc ad~itioa oar R + S+U ($1,632t, 15.75 ac. ). 3) All coMa am cxc]usiv~ of ri~,~t-of-way acquisition.