Bethel Estates 1-LR030718JUL.18.2803 10~24RM REED ENGINEERING 214 350 0019
N0. 108 P.2/4
REEn EI--IGII"IIEEgIr11G
GEOTECHNICALANo Ia R O V P
ENVIRONMENTAL CONSULTANTS,
,~ REPORT TESTS
®thel Estates
i Z o B®thel enton Tap
Coppeh, Texas
REPORTED TO: The Holmes Builders REPORT NO. 1
1406 Halsey Way, Suite 100 REPORT DATE: 07-18-03
Carrollton, texas 75007 REG PROJECT NO. 10277
ATTN: Mr. Terry Holmes TECHNICIAN: P. Butler
PAGE: 1 of 1
CONTRACTOR:
Proctor
No. ASTM
Standard
Dascri tion Optimum
Moisture, % Maximum
Densi PCF
1 D-698 Light red sandy clay wlsome dark brown 14.2 112.6
cla
Depth
Below Field Field
Test Final S. G. Density Moisture Proctor Compaction
No. Date Location (feet) cf % ID Level
1 07-02-03 Sanitary Line: STA 1+50 B.0 110.5 18.7 1 98.1
2 Sanitary Line: STA 1+40 5.0 111.1 16.1 1 98.7
3 Sanita Line: STA 1+30 4.0 110,2 16.9 1 97.9
Comments: Where tested, materials were in compliance with project specifications,
Extranet
Distribution: (1) The Holmes Builders/
Mr, Terry Holmes
(1) The Holmes Builders/Mr. Jon DosterE
Submitted by,
REED ENGINEERING GROUP, LTD.
E.C.
Keith E. Atkins
Manager, CMT
KEAlcn
2424 STUTZ DR. • SUITE 400 DALLAS, TX 75235 rei [214] 350 5600 • Fix [214i 350 0019