SS9901-CS030612Ken Griffin -Force Mains Pa e 1
SS '3C7
From: "Sugg, Ted" <ted.sugg @tcb.aecom.com>
To: <kgriffin @ci.coppell.tx.us>
Date: 6/12/03 2:38PM
Subject: Force Mains
Ken,
Thanks for the faxed copy of the signed supplemental agreement to re- design
the force mains using PE pipe and directional drilling. During construction
of the force mains, it will be necessary to close some of the median
openings on MacArthur Blvd. We are assuming that any of the "turn around"
median openings can be closed for a long period of time to accommodate the
construction. There are several other median openings on MacArthur that may
be required to be closed for a two to four week period for use during
construction and others that may be required to be closed for a day or two
when the pipe is pulled in. Below is a list of all median openings along
Macarthur. Could you indicated whether that median opening could be closed
for a long period of time (2 to 4 weeks), a short period of time (1 to 2
days) or never. We will try to use the turn around median opening whenever
possible for the closures that will require a long period of time, but some
of the median opening listed below will have to be closed at least for the
pull in of the pipe.
Line D
Samual Blvd. /Village Drive h #LA4Z
Lake Forest Drive
Water Side Drive
Allen Road I -Z
N. Village Parkway - Z
Parkway Boulevard Ntwt&
Teal Lane/ Laguna Drive 1 -1-
Line A
Condor Drive 2 -
Bethel School Road 1- a,
Fire Station ... (Never) ',�
Riverchase Drive r.eW2
Entrance to strip center at Beltline wA.s\.L. %e-4—
Ken Griffin - Force Mains Page 2'
I was also wondering what the status of your review of the Sandy Lake List
Station plans were. Let me know when I can get those to complete the design
of the lift station.
Thanks
Ted Sugg, P.E.
Project Manager
Turner Collie & Braden Inc.
17300 Dallas Parkway, Suite 1010
Dallas, Texas 75248 -1145
(972) 735 -3000 Fax (972) 735 -3001
Direct 972 - 735 -3048
E -Mail: ted.sugg @tcb.aecom.com