Community CU-LR030529Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Community Credit Union DATE: 29 May 2003
PROJECT: Community Credit Union-Coppell Branch JOB NO.: 02.1058
687 Denton Tap Rd., Coppell, TX
PJ!ATERIAL DESCRIPTION: 11 On-Site Fill -Tan Shaley Gay
ASTM D 698 STANDARD PROCTOR: 1) 94.0 pct @ 23.0°h Moisture
MOISTURE DRY PERCENT REQUIRED
LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION
PCF
~. 121 Bvoass Rioht Turn.Deceleration Lane
47) approx. 10' west of east end 1 Fin. Sub. 23.1 101.3 107.8 95+
(@ approach)
48) approx. 100' west of east end 1 Fin. Sub. 23.8 101 .3 107.8
491 approx. 175' west of east end 1 Fin. Sub. 24.1 99.6 105.9
TECHNICIAN: CDJ
DISTRIBUTION: 111 Community Credit Union
11) PGAL, lnc.
111 Nelson Consulting, Inc.
11) Mycon General Contractors
121 City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229
,~. ~-
(214) 351-6419 Fax (214) 351-5148