Loading...
Community CU-LR030529Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Community Credit Union DATE: 29 May 2003 PROJECT: Community Credit Union-Coppell Branch JOB NO.: 02.1058 687 Denton Tap Rd., Coppell, TX PJ!ATERIAL DESCRIPTION: 11 On-Site Fill -Tan Shaley Gay ASTM D 698 STANDARD PROCTOR: 1) 94.0 pct @ 23.0°h Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION PCF ~. 121 Bvoass Rioht Turn.Deceleration Lane 47) approx. 10' west of east end 1 Fin. Sub. 23.1 101.3 107.8 95+ (@ approach) 48) approx. 100' west of east end 1 Fin. Sub. 23.8 101 .3 107.8 491 approx. 175' west of east end 1 Fin. Sub. 24.1 99.6 105.9 TECHNICIAN: CDJ DISTRIBUTION: 111 Community Credit Union 11) PGAL, lnc. 111 Nelson Consulting, Inc. 11) Mycon General Contractors 121 City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 ,~. ~- (214) 351-6419 Fax (214) 351-5148