Community CU-LR030321Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETING OPERATIONS
HE JOB N0. 02.1058
CLIENT: Community Credit Union DATE: 2.1 March. 200.3
PROJECT: Community Credit Union-Coppell Branch WEATHER: Partly Cloudy
CONCRETE SUPPLIER: Beall Concrete AIR TEMP: 61°F
LOCATION OF CONCRETE PLACED: Paving sidewalk @ front entry and sidewalk along Denton Tap
from Hwy. 121 to 120' south.
Materials
Cement
Brand Vp Type I Source Bid @ Plant #89
Aggregate Type Source
Size
F.A. 0 - #4
I.A.
C.A. 1" - #4
Design Mix
Mix 33 5D-4 30. si
Max, Water-Cement Ratio by weight
Batch Weights - S. 5. Dry Basis:
Sand Beall Cement 470. F.A. 1346
I.A. C.A. .1850
Cr. Stone Beall Admix MB 300N @ 14.3. oz/yd
MBAE 94 @ 2 oz `yd
Actual Batch Computations:
~ Free Actual
Moisture Water Batch Wts.
Cement
F.A. 5.0
I.A.
470
67 1413
C.A.
Total Free Water
Added at Mixer
Total Water
Time Started; 11:3Qam
Time Finished: 1;O.Opm
Concrete Placed, c.y.: Z0
Concrete Temp: 70~F
Cylinders Made: 151 - 154
.1850 Remarks:
67 lbs.
191 lbs. /~
%
258 lbs. /~
- -
%
Certified Correct CBC
Inspector
2870 Walnut Hill Lane Dallas, Texas 75229 (2'14) 351-6419 Fax (214) 351-5'148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: Community Credit Union DATE: 21 March 2003
PROJECT: Community Credit Union-Coppell Branch JOB N0. 02.1058
Coppell, TX
TIME: 1.0 hour
AREA INSPECTED: Paving, sidewalk at front entry and sidewalk along Denton Tap
from Hwy. 121 to 120' south
DATE OF INSPECTION: 3/21/03 (10:30am-11:30am)
DEFICIENCIES NOTED:
NUMBER
LOCATION/ITEM DESCRIPTION
CORRECTIONS
OBSERVED
None
REMARKS
All items reviewed were present and placed according to project plans and
specifications, at time of final inspection.
TECHNICIAN: CBC
DISTRIBUTION: {1) Community Credit Union
(1) PGAL, Inc.
(1) Nelson Consulting, Inc.
(1) Mycon General Contractors
(2) City of Coppell
f=~ ~-~
2870 Walnut Hill Lane Daltas, Texas 75229 (214) 351-64'19 Fax (214) 351-5748