Loading...
Community CU-LR030321Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB N0. 02.1058 CLIENT: Community Credit Union DATE: 2.1 March. 200.3 PROJECT: Community Credit Union-Coppell Branch WEATHER: Partly Cloudy CONCRETE SUPPLIER: Beall Concrete AIR TEMP: 61°F LOCATION OF CONCRETE PLACED: Paving sidewalk @ front entry and sidewalk along Denton Tap from Hwy. 121 to 120' south. Materials Cement Brand Vp Type I Source Bid @ Plant #89 Aggregate Type Source Size F.A. 0 - #4 I.A. C.A. 1" - #4 Design Mix Mix 33 5D-4 30. si Max, Water-Cement Ratio by weight Batch Weights - S. 5. Dry Basis: Sand Beall Cement 470. F.A. 1346 I.A. C.A. .1850 Cr. Stone Beall Admix MB 300N @ 14.3. oz/yd MBAE 94 @ 2 oz `yd Actual Batch Computations: ~ Free Actual Moisture Water Batch Wts. Cement F.A. 5.0 I.A. 470 67 1413 C.A. Total Free Water Added at Mixer Total Water Time Started; 11:3Qam Time Finished: 1;O.Opm Concrete Placed, c.y.: Z0 Concrete Temp: 70~F Cylinders Made: 151 - 154 .1850 Remarks: 67 lbs. 191 lbs. /~ % 258 lbs. /~ - - % Certified Correct CBC Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (2'14) 351-6419 Fax (214) 351-5'148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION CLIENT: Community Credit Union DATE: 21 March 2003 PROJECT: Community Credit Union-Coppell Branch JOB N0. 02.1058 Coppell, TX TIME: 1.0 hour AREA INSPECTED: Paving, sidewalk at front entry and sidewalk along Denton Tap from Hwy. 121 to 120' south DATE OF INSPECTION: 3/21/03 (10:30am-11:30am) DEFICIENCIES NOTED: NUMBER LOCATION/ITEM DESCRIPTION CORRECTIONS OBSERVED None REMARKS All items reviewed were present and placed according to project plans and specifications, at time of final inspection. TECHNICIAN: CBC DISTRIBUTION: {1) Community Credit Union (1) PGAL, Inc. (1) Nelson Consulting, Inc. (1) Mycon General Contractors (2) City of Coppell f=~ ~-~ 2870 Walnut Hill Lane Daltas, Texas 75229 (214) 351-64'19 Fax (214) 351-5748