Loading...
Community CU-LR021122Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Community Credit Union DATE: 22 November 2002 PROJECT: Community Credit Union-Coppell Branch JOB N O.: 02.1058 687 Denton Tap Rd., Coppell, TX MATERIAL DESCRIPTION: 1) Lime Stabilized Subgra de -Tan Clay with Lime ASTM D 698 STANDARD PROCTOR: 1) 90.0 pcf @ 25.5°k Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION PCF East Parkino Area/Drive 32) approx. 80' north of south curbline 1 approx. 25' west of east curbline North Parking Area/Drive 33- approx. 20' south of north curbline 1 approx. 75' west of east curbline West Parkin g Area/Drive 34- approx. 75' south of north curbline 1 approx. 10' east of west curbline 35) approx. 150' north of south curbline 1 approx. 15' east of west curbline South Parking Area/Drive 361 approx. 40' north of south curbline 1 approx. 75' west of east curbline East Parking Area/Drive 371 approx. 100' north of south curbline 1 approx. 5' e ast of west curbline South Parking Area/Drive 381 approx. 15' north of south curbline 1 approx. 80' east of west curbline West Parkin g Area/Drive 39) approx. 125 ' south of north curbline 1 approx. 10' east of west curbline North Parkin g Area/Drive 40) approx. 15' north of south curbline 1 approx. 100' west of east curbline Fin. Sub. 25.9 89.8 99.8 95+ -2% to +4°~ Of Optimum Fin. Sub. 26.0 86.7 96.3 Fin. Sub. 26.0 89.9 99.9 Fin. Sub. 26.3 86.0 95.5 Fin. Sub. 25.7 85.7 95.2 Fin. Sub. 23.5 86.1 95.7 Fin. Sub. 40.9 78.8 87.5 Fin. Sub. 27.2 85.8 95.3 Fin. Sub. 29.2 87.1 96.7 *Test results indicate fill is not compacted to required density/moisture. Contractor notified. TECHNICIAN: MFM (2 trips) i~r~' 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148