Loading...
Community CU-LR021028Hooper Engineering Laboratories, Inc. Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION CLIENT: Community Credit Union DATE: 28 October 2002 PROJECT: Community Credit Union-Coppell Branch JOB N0. 02.1058 Coppell, TX TIME: 1.0 hour AREA INSPECTED: Grade beam on D line from C.1 line to A.9 line; dumpster pad grade beam DATE OF INSPECTION: 10/28/02 (10:OOam-11 :OOam) DEFICIENCIES NOTED: NUMBER LOCATION/ITEM DESCRIPTION CORRECTIONS OBSERVED 1 Mud on steel. TECHNICIAN: CBC DISTRIBUTION: (1) Community Credit Union {1) PGAL, Inc. (1) Nelson Consulting, Inc. {1) Mycon General Contractors (2) City of Coppell Yes ,~~ 2s70 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB N0. 02.1058 CLIENT: Community Credit Union DATE: 28 October 200.2 PROJECT: Community Credit Union-Coppell Branch. WEATHER: Cloudy/Lt. Rain CONCRETE SUPPLIER: Beall Concrete AIR TEMP: 62°F LOCATION OF CONCRETE PLACED: Grade beam on D line f xom C.1 line to A.g line and diunpster pad grade beam Materials Cement: Brand `/p Type I Aggregate Type Size Source Bin @ Plant ~8fl Source Design Mix Mix330,715g1 3QQ si Max. Water-Cement Ratio by weight Batch Weights - S. S. Dry Basis: F.A. p - #4 Sand Beall Cement 40.0./70_ F.A. 1445 I.A. I.A. C.A. 185Q C.A. 1" - #4 Cr. Stone Beall Admix Mg 30ON @ 11..8 oz/yd Actual Batch Computations: Moisture Cement F.A. 5•Q I.A. C.A. Free Actual Water Batch Wts. 400/70. L 1517 Total Free Water Added at Mixer Total Water 18 50 72 lbs. 186 lbs. 258 lbs. Time Started: 11;OAam Time Finished: 1:3Qpm Concrete Placed, c.y.: _10 Concrete Temp: 73°F Cylinders Made: 49 - 52 Remarks: This max was previously appxoved for use, per supt. ~.,~..-- Certified Correct CBC Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148