Community CU-LR021028Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: Community Credit Union DATE: 28 October 2002
PROJECT: Community Credit Union-Coppell Branch JOB N0. 02.1058
Coppell, TX
TIME: 1.0 hour
AREA INSPECTED: Grade beam on D line from C.1 line to A.9 line; dumpster pad grade beam
DATE OF INSPECTION: 10/28/02 (10:OOam-11 :OOam)
DEFICIENCIES NOTED:
NUMBER LOCATION/ITEM DESCRIPTION
CORRECTIONS
OBSERVED
1 Mud on steel.
TECHNICIAN: CBC
DISTRIBUTION: (1) Community Credit Union
{1) PGAL, Inc.
(1) Nelson Consulting, Inc.
{1) Mycon General Contractors
(2) City of Coppell
Yes
,~~
2s70 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETING OPERATIONS
HE JOB N0. 02.1058
CLIENT: Community Credit Union DATE: 28 October 200.2
PROJECT: Community Credit Union-Coppell Branch. WEATHER: Cloudy/Lt. Rain
CONCRETE SUPPLIER: Beall Concrete AIR TEMP: 62°F
LOCATION OF CONCRETE PLACED: Grade beam on D line f xom C.1 line to A.g line and
diunpster pad grade beam
Materials
Cement:
Brand `/p Type I
Aggregate Type
Size
Source Bin @ Plant ~8fl
Source
Design Mix
Mix330,715g1 3QQ si
Max. Water-Cement Ratio by weight
Batch Weights - S. S. Dry Basis:
F.A. p - #4 Sand Beall Cement 40.0./70_ F.A. 1445
I.A. I.A. C.A. 185Q
C.A. 1" - #4 Cr. Stone Beall Admix Mg 30ON @ 11..8 oz/yd
Actual Batch Computations:
Moisture
Cement
F.A. 5•Q
I.A.
C.A.
Free Actual
Water Batch Wts.
400/70.
L 1517
Total Free Water
Added at Mixer
Total Water
18 50
72 lbs.
186 lbs.
258 lbs.
Time Started: 11;OAam
Time Finished: 1:3Qpm
Concrete Placed, c.y.: _10
Concrete Temp: 73°F
Cylinders Made: 49 - 52
Remarks: This max was previously
appxoved for use, per supt.
~.,~..--
Certified Correct CBC
Inspector
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148