Community CU-LR021016Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
JOB NO.: 02.1058
CLIENT: Community Credit Union DATE: 16 October 2002
PROJECT: Community Credit Union-Coppell Branch SUPPLIER: Beall
LOCATION OF POUR SET 1: Screen wall footing, from existing wall 0'-60' west
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX N0. 330J1541
Truck No. 215 Cement 400 Type I
Ticket No. 88012405 Flyash 70
Time Batched 1:42pm Sand 1445
Time Sampled 2:40pm in.
Concrete Temp. (ASTM cios4) 78°F 1.0 in. 1850
Air Content (ASTM cz3il Water 258
Unit Weight (ASTM ct361 Admix X11 MB 300N @ 11.8 oz.
Admix 1J2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM cis) (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
41 5.25 7 10/23/02 118,300 4180
42 5.25 28 11/13/02 135,600 4800
43 5.25 28 11/13/02 136,600 4830
44 5.25 56 12/11/02 136,700 4840
28-Day Average 4820
3000
TECHNICIAN: EWM
DISTRIBUTION: (11 Community Credit Union
111 PGAL, Inc.
(1) Nelson Consulting, Inc.
111 Mycon General Contractors
121 City of Coppell
,~.. ~-
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: Community Credit Union DATE: 16 October 2002
PROJECT: Community Credit Union-Coppell Branch JOB N0. 02.1058
Coppell, TX
TIME: 1.5 hours
AREA INSPECTED: Screen wall footing along south property line, approx. 140' in length
from existing wall on carton forms
DATE OF INSPECTION: 10/16/02 (1:OOpm-2:30pm)
DEFICIENCIES NOTED:
NUMBER LOCATION/ITEM DESCRIPTION
CORRECTIONS
OBSERVED
1 Trash on carton forms.
TECHNICIAN: EWM
DISTRIBUTION: 11) Community Credit Union
11) PGAL, Inc.
(1) Nelson Consulting, Inc.
(1) Mycon General Contractors
(2) City of Coppell
Yes
~,~
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETING OPERATIONS
HE JOB N0. 02.1058
CLIENT: Community Credit Union DATE: 16 October 2002
PROJECT: Community Credit Union-Coppell Branch. WEATHER: Partly Cloudy
CONCRETE SUPPLIER: Beall Concrete AIR TEMP: 65-70°F
LOCATION OF CONCRETE PLACED: Screen wall footing, south. property line, approx. 140' in
length from existing. wall on carton forms.
Materials
Cement:
Brand VP Type I Source Bin @ Plant #88
Aggregate Type Source
Size
Design Mix
Mix 330~715~1 3pDbps i
Max. Water-Cement Ratio by weight
Batch Weights - S. S. Dry Basis:
F.A. Q - #4 Sand Beall Cement 40.Q/70. F .A. 1445
I.A. I.A. C .A. 1850
C.A. 1" - #4 Cr. Stone Beall Admix Mg 30.ON @ 11. 8 oz/vd
Actual Batch Computations:
Time Started: 1:ODpm
% Free Actual
Moisture Water Batch Wts. Time Finished: S:O.Opm
Cement 400/70 Concrete Placed, c.y .: 22.5
F.A. 5,p 72 1517 Concrete Temp: 78°F
I.A. Cylinders Made: 41 - 44
C.A. iRSn Remarks:
Total Free Water 72 lbs.
Added at Mixer 18fi lbs.
Total Water lbs
~_
.
Certified Correct EWM
Inspector
287° Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 35'1-5748
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 02.1058
CLIENT: Community Credit Union DATE: 16 October 2002
PROJECT: Community Credit Union-Coppell Branch SUPPLIER: Bea11
LOCATION OF POUR SET 1: Screen wall footing, from existing wall 0'-60' west
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX N0. 330J1541
Truck No. 215 Cemeni 400 Type I
Ticket No. 88012405 Flyash 70
Time Batched 1:42pm Sand 1445
Time Sampled 2:40pm in.
Concrete Temp. (ASrM ctoeal 78°F 1.0 in. 1850
Air Content IASrM czstl Water 258
Unit Weight lASrM ctss! Admix #1 MB 300N @ 11.8 oz.
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS iasrM cssl (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
41 5.25 7 10/23/02 118,300
42 5.25 28 1 1 /13/02
43 5.25 28 11/13/02
44 5.25 56 12/1 1 /02
28-Day Average
TECHNICIAN: EWM
DISTRIBUTION: (1) Community Credit Union
(1- PGAL, Inc.
111 Nelson Consulting, Inc.
(1) Mycon General Contractors
(2) City of Coppell
4180
3000
,~.. ~-
2870 Walnut Hill Lane Dallas, Texas 75229 {214) 351-6419 Fax {214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
JOB NO.: 02.1058
CLIENT: Community Credit Union DATE: 16 October 2002
PROJECT: Community Credit Union-Coppell Branch SUPPLIER: Beall
LOCATION OF POUR SET 1: Screen wall footing, from existing wall 0'-60' west
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX N0. 330J1541
Truck No. 215 Cement 400 Type I
Ticket No. 88012405 Flyash 70
Time Batched 1:42pm Sand 1445
Time Sampled 2:40pm in.
Concrete Temp. (ASrM ctosal 78°F 1.0 in. 1850
Air Content (ASTM cz3t) Water 258
Unit Weight (ASTM ct3sl Admix #1 MB 300N @ 11.8 oz.
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM cast (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C1431 psi Strength
41 5.25 7 10/23/02
42 5.25 28 11/13/02
43 5.25 28 11/13/02
44 5.25 56 1211 1 /02
118,300 4180
135,600 4800
136,600 4830
28-Day Average 4820 3000
TECHNICIAN: EWM
DISTRIBUTION: (1) Community Credit Union
(1) PGAL, Inc.
(1) Nelson Consulting, Inc.
(1 } Mycon General Contractors
(2) City of Coppell
~,.. ~-
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148