Loading...
Community CU-LR021016Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1058 CLIENT: Community Credit Union DATE: 16 October 2002 PROJECT: Community Credit Union-Coppell Branch SUPPLIER: Beall LOCATION OF POUR SET 1: Screen wall footing, from existing wall 0'-60' west LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX N0. 330J1541 Truck No. 215 Cement 400 Type I Ticket No. 88012405 Flyash 70 Time Batched 1:42pm Sand 1445 Time Sampled 2:40pm in. Concrete Temp. (ASTM cios4) 78°F 1.0 in. 1850 Air Content (ASTM cz3il Water 258 Unit Weight (ASTM ct361 Admix X11 MB 300N @ 11.8 oz. Admix 1J2 AEA COMPRESSIVE STRENGTH TESTS (ASTM cis) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 41 5.25 7 10/23/02 118,300 4180 42 5.25 28 11/13/02 135,600 4800 43 5.25 28 11/13/02 136,600 4830 44 5.25 56 12/11/02 136,700 4840 28-Day Average 4820 3000 TECHNICIAN: EWM DISTRIBUTION: (11 Community Credit Union 111 PGAL, Inc. (1) Nelson Consulting, Inc. 111 Mycon General Contractors 121 City of Coppell ,~.. ~- 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION CLIENT: Community Credit Union DATE: 16 October 2002 PROJECT: Community Credit Union-Coppell Branch JOB N0. 02.1058 Coppell, TX TIME: 1.5 hours AREA INSPECTED: Screen wall footing along south property line, approx. 140' in length from existing wall on carton forms DATE OF INSPECTION: 10/16/02 (1:OOpm-2:30pm) DEFICIENCIES NOTED: NUMBER LOCATION/ITEM DESCRIPTION CORRECTIONS OBSERVED 1 Trash on carton forms. TECHNICIAN: EWM DISTRIBUTION: 11) Community Credit Union 11) PGAL, Inc. (1) Nelson Consulting, Inc. (1) Mycon General Contractors (2) City of Coppell Yes ~,~ 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB N0. 02.1058 CLIENT: Community Credit Union DATE: 16 October 2002 PROJECT: Community Credit Union-Coppell Branch. WEATHER: Partly Cloudy CONCRETE SUPPLIER: Beall Concrete AIR TEMP: 65-70°F LOCATION OF CONCRETE PLACED: Screen wall footing, south. property line, approx. 140' in length from existing. wall on carton forms. Materials Cement: Brand VP Type I Source Bin @ Plant #88 Aggregate Type Source Size Design Mix Mix 330~715~1 3pDbps i Max. Water-Cement Ratio by weight Batch Weights - S. S. Dry Basis: F.A. Q - #4 Sand Beall Cement 40.Q/70. F .A. 1445 I.A. I.A. C .A. 1850 C.A. 1" - #4 Cr. Stone Beall Admix Mg 30.ON @ 11. 8 oz/vd Actual Batch Computations: Time Started: 1:ODpm % Free Actual Moisture Water Batch Wts. Time Finished: S:O.Opm Cement 400/70 Concrete Placed, c.y .: 22.5 F.A. 5,p 72 1517 Concrete Temp: 78°F I.A. Cylinders Made: 41 - 44 C.A. iRSn Remarks: Total Free Water 72 lbs. Added at Mixer 18fi lbs. Total Water lbs ~_ . Certified Correct EWM Inspector 287° Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 35'1-5748 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1058 CLIENT: Community Credit Union DATE: 16 October 2002 PROJECT: Community Credit Union-Coppell Branch SUPPLIER: Bea11 LOCATION OF POUR SET 1: Screen wall footing, from existing wall 0'-60' west LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX N0. 330J1541 Truck No. 215 Cemeni 400 Type I Ticket No. 88012405 Flyash 70 Time Batched 1:42pm Sand 1445 Time Sampled 2:40pm in. Concrete Temp. (ASrM ctoeal 78°F 1.0 in. 1850 Air Content IASrM czstl Water 258 Unit Weight lASrM ctss! Admix #1 MB 300N @ 11.8 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS iasrM cssl (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 41 5.25 7 10/23/02 118,300 42 5.25 28 1 1 /13/02 43 5.25 28 11/13/02 44 5.25 56 12/1 1 /02 28-Day Average TECHNICIAN: EWM DISTRIBUTION: (1) Community Credit Union (1- PGAL, Inc. 111 Nelson Consulting, Inc. (1) Mycon General Contractors (2) City of Coppell 4180 3000 ,~.. ~- 2870 Walnut Hill Lane Dallas, Texas 75229 {214) 351-6419 Fax {214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1058 CLIENT: Community Credit Union DATE: 16 October 2002 PROJECT: Community Credit Union-Coppell Branch SUPPLIER: Beall LOCATION OF POUR SET 1: Screen wall footing, from existing wall 0'-60' west LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX N0. 330J1541 Truck No. 215 Cement 400 Type I Ticket No. 88012405 Flyash 70 Time Batched 1:42pm Sand 1445 Time Sampled 2:40pm in. Concrete Temp. (ASrM ctosal 78°F 1.0 in. 1850 Air Content (ASTM cz3t) Water 258 Unit Weight (ASTM ct3sl Admix #1 MB 300N @ 11.8 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM cast (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C1431 psi Strength 41 5.25 7 10/23/02 42 5.25 28 11/13/02 43 5.25 28 11/13/02 44 5.25 56 1211 1 /02 118,300 4180 135,600 4800 136,600 4830 28-Day Average 4820 3000 TECHNICIAN: EWM DISTRIBUTION: (1) Community Credit Union (1) PGAL, Inc. (1) Nelson Consulting, Inc. (1 } Mycon General Contractors (2) City of Coppell ~,.. ~- 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148