Loading...
Callahan-LR030128i-- 11440 Reeder Rd. • Dallas, TX 75229 saxao coxsvzxerrxs, rxc' Tel. (214) 352-4100 • Fax (214) 352-4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Bonner Associates PROJECT: Callahan Addition Coppell, Texas Sample Date: 1-28-03 Project No.: M02-412 ~ CONCRETE INFORMATION CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT C3 Constructors 104229 CONCRETE SUPPLIER: Redi-Mix 66 PLANT/TRUCK: 11228 69 MIX ID NUMBER: 721 1:55 p.m. AIR (%) (ASTM C-173) - 3:00 p.m. WATER ADDED (gal); 0 Partly cloudy/Windy SLUMP (inches) (ASTM c-143) 4 112 Elevator Shaft Walls (sub-ground floor) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (Pounds) COMPRESSIVE STRENGTH (psl) SPECIFIED COMPRESSIVE STRENGTH (psl) 1A 7 2-4-03 80000 2830 3000128 da s 1B 28 2-25-03 115000 4070 1 C 28 2-25-03 122500 4330 1 D Hold - Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Curin Technician: Gary Moore, CET FARGO CONSULTANTS, INC. Checked By:~~~~ Distribution: Bonner Associates -Tim Bonner City ofCoppell -Rick Odell C3 Constructors -Taylor Barnes Environmental Services ~ Geotechnica/ Engineering ^ Construction Materials Testing i FAR.00 CONBULTANTa, INC. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Bonner Associates PROJECT: Callahan Addition Coopell, Texas Sample Date: 1-28-03 Project No.: M02-412 CONCRETE INFORMATION CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: C3 Constructors 104229 CONCRETE SUPPLIER: Redi-Mix 66 PLANTITRUCK: 1/228 69 MIX ID NUMBER: 721 1:55 p.m. AIR (%) (ASTM C-173) - 3:00 p.m. WATER ADDED (gal): 0 Partly cloudy/ Windy SLUMP (inches) (asTM c-~a3) 4 1/2 Elevator Shaft Walls (sub-ground floor} CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (Pounds) COMPRESSIVE STRENGTH (psi) SPECIFIED COMPRESSIVE STRENGTH (psi) 1A 7 2-4-03 80000 2830 3000! 28 da s 1 B 28 2-25-03 1 C 28 2-25-03 1 D Hold - Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Curin Technician: Gary Moore, CET FARGO CONSULTANTS, INC. Checked By: ~~~~=- Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick Odell C3 Constructors -Taylor Barnes Environmental Services ^ Geotechnica/ Engineering ^ Construction Materials Testing i FAfi00 CONBULTANTB, INC, 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 Report of Reinforcing Steel Inspection Client: Bonner Associates Project: Callahan Addition Locations and Items Inspected: Elevator shaft walls (sub-ground floor) Project No.: M02-412 Date of Service: 01-28-03 Item Conforming Items Conforming Items Conforming Observed Observed Observed Column Placing Bar Length Ties Drawings Yes and Shape yes Properly N/A Approved Tied and S aced Stirrup Bar Size Yes* Pro er Bar yes Spacing and N/A pla ement T e erly a p d Bar Grade Yes Tied yes S p e Yes Bar Clean Yes Dowe] Bars Yes Welded N/A in Place Slices Form Clean Yes Proper Bar Yes Mechanical N/A Su orts Slices Number of Yes Proper yes Bars Cover N/A: Indicated not applicable Remarks: * Two #3 rebar secured together with tie wire, was installed in lieu of planned #4 rebar. Approved on 1/27/03 by Mr. Larry Smith with Larry Smith Engineers, requested by Mr. Taylor Barnes with C3 Constructors. Plans utilized approved date 12/08/02, sheet no. FDN 101. Technician: Gary Moore, CET Checked by: ~~ Respectfully Submitted, Fargo Consultants Inc. LIMITATIONS: The tut results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, e[c.) or any other failure of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive us< of the clirnt's to whom they are addressed and shalt not to reproduced except in full without the written approval of Fazgo Consultants, Inc. Environments/ Services ~ Geotechnica/ Engineering ~ Construction Materials resting FAICOO CONBULTANTB, INC. REPORT OF FIELD COMPACTION 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-481 L Tested For: Bonner Associates Date Performed: 01-28-03 Project: Callahan Addition FCI Project No.: M02-412 Coppell, Texas Density: Per ASTM D-2922 Gauge Manuf.: Humboldt Moisture: Per ASTM D-3017 Gauge Model: HS-5001 EZ Test Mode (DT / BS): DT Probe Depth: 8 inches M(ITSTTiRF./iIF,NSTTY RELATIONS Proctor No. Material Description Optimum Moisture % Maximum Dry Densit PCF 5 Reddish Brown Cla ey Sand (Select Fill) 12.0 121.5 iN_PT.ACF. TEST RESTiT,TS Test v Elevation or Location Proctor No Percent Moisture Dry Density Percent Density NO' Lift . PCF ' Electrical, 10' south by 15' west from northeast comer 5 14 0 116 4 8 95 112 FG-1 of building pad . . . 113 FG-0.5' Electrical, 10' south by 15' west from northeast corner 5 12.7 116.9 96.2 of buildin ad 114 FG Electrical, 10' south by 15' west from northeast corner 5 12 9 117 6 96 8 of building pad . . . (R) AFTER TEST NUMBER INDICATES RETEST (F) INDICATES FAILURIi 7 U I;uMYLr wIt n t Technician: Gary Moore, CET Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick Odell C3 Constructors -Taylor Barnes ICC,I/UIICCMbN I J Checked By: ~_ LIMITATIONS' The lest results presented herein were prepared hued upon [M1e specific samples provided far testing. We usume no responsibility for vitiation in quality (composition, appearance, performance, ac.) or any ocher failure of similar subject matter provided by persons or conditions over which we have no control. Our levers and reports arc for [he exclusive use of the clienPs to whom they aze addressed and shall not be reproduced except in full without tM1e written approval of Fargo Consultants, Inc. Environmental Services ^ Geotechnica/ Engineering ~ Construction Materia/s Tesfing