ST9502-CS 960717DATE= TO= FROM: RE: COPPELL ENGINEERING UTILITIES DIVISION MEHO~UM JUly 17, 1996 Larry Davis, Construction Inspector Larry Smith, Utilities Department Walk thru for Town Center Blvd. A walk-thru on the above referenced project was conducted on 7-17-96 and the items below were found to be deficient. Pour concrete pad around Main Line Valve at the tie in at Parkway Blvd. All Main Line Valves and Fire Hydrant Valves need to be marked on the street. The Fire Hydrant Valve at the 2nd fire hydrant on the west side of the street needs straightening up so the valve wrench can get on it. The first Manhole south of Parkway in the middle of the street needs chimney seal tightened up. (It is very loose and may fall in.) The 2nd fire hydrant on the east side of the street is leaking at the Bonnet. The 2nd Manhole in the middle of the street south of Parkway needs the chimney seal tightened up.(It may fall in.) The 3rd fire hydrant on the east side of the road is leaking below the ground. The 3rd Manhole in the middle of the street south of Parkway need to be tightened. Locate the Sewer Stub-out on the west side of the street near the first Manhole. Please ensure that these items get taken care of and if you have any questions, please give me a call. post-it® Fax Note 7671 Date 7 From 07/17/96 BNOXNEERZNO - 8! MEMOPJ Post-it® Fax Note 7671 Co./Dept. ,~r,L~'/~ ~ Phone # Date co, a DaTEX July 17, 1996 Larry Davis, Construeflea lnspeotor FROH~ Per Birdsall~ sign Signal Teoh-~p~ REx Walk Thru for Town Center Blvd. A walk through was conducted at the above referenced location today, The followin~ deficiencies were identified~ P~rKw~y Left Turn 7.ane 1, on the westbound reverse curve curb return - repair. 2. Median paver bands on existin~ pavement curbs need to be sealed so to retain sand under payere. Towncent.er.H~vd, 1. ? 4" PVC in ADA ram~ on northeast corner Towncenter Blvd./ParkWay 2. Markings? ~outhbound Towncenter Blvd, 1. Nanhole finish rout and seal crack. 2. Remove two birdbaths southbound lane north of Towncenter Drive, 3. Curb broken on median southbound lane north on Towncenter Drive, 4. RemoVe form rd. side Towncenter Blvd./Towncenter Drive southbound lanes, 5, Repair existin9 curb rd, side southbound lanes Towncenter ~lvd,/Towncenter Drive. Northbound Towncenter Elv~. 1. Northbound lane remove stain from pavement Just south of Parkway. ENGXNEERINQ - STREET MEMORANDUM DaTEX TOx FROM: ~Uly 17t 1996 Larr7 Davist Construction Xnspeotor Per birdsall# sign Signal Taoh-~~ Walk Thru for Town Center Blvd. A walk through was conducted at the above referenced location today. The following deficiencies were identified: Parkway Left Turn Lane 1. on the westbound reverse curve curb return - repair. 2. Median paver bands on existing pavement curbs need to be sealed so to retain sand under pavers. Towncenter 1. ? 4" PVC in ADA ramp on northeast corner Towncenter Blvd./Parkway 2. Markings? $outhbound. Townoenter Blvd. 1. Manhole finish rout and seal crack. 2. RemOve two birdbaths southbound lane north of Towncenter Drive. 3. curd broken on median southbound lane north on Towncenter DriVe. 4. Remove form rd. side Towncenter Blvd./Towncenter Drive southb0und lanes. 5. Repair existing curb rd. side southbound lanes Towncenter Blvd./Towncenter Drive. Northbound ~owncenter Biy~. 1. Northbound lane remove stain from pavement Just south of Parkway. General. Co~m.e~t~ street needs to be cleaned to determine birdbaths. Towncenter Drive/Towncenter Blvd. Project med. nose southbound lanes random crack. From center line Towncenter Blvd. on Towncenter Drive northt curb on the east side needs repaired. Not poured integral -- broken by construction traffic for Criminal Justice Center. PB/bc