Loading...
Callahan-LR030120FAROO CONSULTANTS, INC. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 MOISTURE/DENSITY RELATIONSHIP OF SOILS CLIENT: Bonner Associates PROJECT: Callahan Addition Coppell, Texas REPORT DATE: 01-20-03 FCI PROJECT NO: M02-412 SAMPLE DATE: 01-17-03 METHOD OF TEST SAMPLE IDENTIFICATION: Sample I.D.: Sample Description: Sample Origin: MOISTURE/DENSITY: Preparation Procedure: Rammer Description: Maximum Dry Density: (Ibs/cu ft) Optimum Moisture Content (%): ATTERBERG LIMITS: Plasticity Index: Technician: Gary Moore, CET ASTM D-698 (Method C) ASTM D-4318 Crushed Concrete Haul-in (On site stockpile} Moist Manual 119.0 14.0 Non-plastic FARGO CONSULTANTS, INC. Checked by: Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick O'Dell C3 Contractors -Taylor Barnes Environmental Services ^ Geofechnica/ Engineering ~ Construction Materia/s Testing FAROO CONSULTANTS, INC. REPORT OF FIELD COMPACTION 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 Tested For: Bonner Associates Date Performed: 01-20-03 Project: Callahan Addition FCI Project No.: M02-412 Coppell, Texas Density: Per ASTM D-2922 Gauge Manuf.: Humboldt Moisture: Per ASTM D-3017 Gauge Model: HS-SOOIEZ Test Mode (DT / BS): DT Probe Depth: 8 inches Mf1LCTTiRF/DF.NSTTV RF.T.ATiONS Proctor No. ~ Material Description Optimum Moisture % Maximum Dry Densit PCF 5 Reddish Brown Clayey Sand (Select Fill) 12.0 121.5 TN_PT.A('F TF.CT RFSTTT.TC a Test - v Elevation nr Location Proctor IYo Percent Moisture Dry D Percent Density Nn LiR . PCF 101 5' FG-1 Sanitary sewer line - 15' north by 5' east from 5 13.1 116.3 95.7 . southwest corner of building ad 102 FG-1' Sanitary sewer line - 35' north by 5' east from 5 12.4 115.9 95.4 southwest corner of building pad 103' 5' FG-0 Sanitary sewer line - 50' north by 5' east from 5 12.2 115.6 95.1 . southwest corner of buildin ad 104 FG Sanitary sewer line - 20' north by 5' east from 5 12.9 116.8 96.1 southwest corner of buildin ad 105 FG Sanitary sewer line - 10' south by 20' west from 5 13.6 116.4 95.8 northeast corner of building ad (R) AFTER TEST NUMBER INDICATES RETEST (F) INDICATES FAILUKE'1'U CVMYLY wnx ercudGC I rcrtluttcnMCrv la Technician: Jeff Clifton Checked By: ./%~ Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick Odell C3 Contractors -Taylor Barnes LIMITATIONS'. The test results preserved herein were prepared based upon [he specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other failure of similar subject matter provided by persons or conditions over which we have no control. Our letters and repotts are for the exclusive use of the client's to whom they are addressed and shall not be reproduced except in full without the written approval of Fargo Consultants, Inc. Environmental Services ~ Geotechnica/ Engineering ~ Construction Materials Testing