Loading...
Callahan-LR03010711440 Reeder Rd. o Dallas, TX 75229 Tel. (214) 3524100 · Fax (214) 352-4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Bonner Associates PROJECT: Callahan Addition Coppell, TeXas Sample Date: 01-07-03 Project No.: M02-412 CONCRETE INFORMATION CONTRACTOR: C3 Contractors TICKET NO.: 103122 AMBIENT TEMP. (°F): 58 CONCRETE TEMP. (°F): 64 TIME BATCHED: 1:58 p.m. TIME SAMPLED: 3:23 p.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Redi-Mix PLANT/TRUCK: 1/109 MIX ID NUMBER: 919 AIR (%) (ASTM C-231) - WATER ADDED (gal): 0 SLUMP (inches) (ASTM C-143) 4 % Piers E-7, E-6.5, E-6, E-5.5, E-5, C.8-5, C-5, B-6, A-6.1, D.5-7, C-7, B.5-7, B-7, A-7, A-7.8, AA-6.2, AA-6.5, A-6.5 and AA-7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28i27 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE NUMBER (Days) TESTED (Pounds) STRENGTH STRENGTH (psi) (psi) lA 7 1-14-03 67500 2390 3000/28 days lB 28 2-04-03 ' 108000 3820 1C 28 2-04-03 105000 3710 1D Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Curin[l: Technician: Gary Moore, CET FARGO CONSULTANTS, INC. Checked By: ~ Distribution: Bonner Associates - Tim Bonner City of Coppell - Rick Odell C3 Contractors - Taylor Barnes Env/ronmenta/ Serv/ces · Geotechnica/ Eng/)Teer/ng · Construc#on Mater~als Testing 11440 Reeder Rd. · Dallas, TX 75229 FARGO CONSUI,TANT8, INC. Tel. (214) 352-4100 · Fax (214) 352-4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Bonner Associates PROJECT: Callahan Addition Coppell, Texas Sample Date: 01-07-03 Project No.: M02-412 CONCRETE INFORMATION CONTRACTOR: C3 Contractors TICKET NO.: 103122 AMBIENT TEMP. (°F): 58 CONCRETE TEMP. (°F): 64 TIME BATCHED: 1:58 p.m. TIME SAMPLED: 3:23 p.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Redi-Mix PLANT/TRUCK: 1/109 MIX ID NUMBER: 919 AIR (%) (ASTM C-231) WATER ADDED (gal): 0 SLUMP (inches) (ASTM C-143) 4 % Piers E-7, E-6.5, E-6, E-5.5, E-5, C.8-5, C-5, B-6, A-6.1, D.5-7, C-7, B.5-7, B-7, A-7, A-7.8, AA-6.2, AA-6.5, A-6.5 and AA-7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE NUMBER (Days) TESTED (Pounds) STRENGTH STRENGTH (psi) (psi) 1A 7 1 - 14-03 67500 2390 3000/28 days 1B 28 2-04-03 1C 28 2-04-03 1D Hold Specifications: Making & ASTM O-31 Testing Methods: ASTM C-143, ASTM 0-39 Curing: Technician: Gary Moore, CET Distribution: Bonner Associates - Tim Bonner City ofCoppell - Rick Odell C3 Contractors - Taylor Barnes FARGO CONSULTANTS, INC. Checked By: l~/t~ Environmental Services · Geotechn/ba/ Engineering · Construction Materials Testing 11440 Reeder Rd. · Dallas, TX 75229 FARGO CONSULTANTS, INC. Tel. (214) 352-4100 · Fax (214) 352-4811 Page 1 of 2 DRILLED PIER REPORT Client: Bonner Associates Project: Callahan Addition Date of Observation: 01-07-03 Project No: M02-412 Concrete Supplier: Redi-Mix Drilling Contractor:Long & Long Pier Drilling Shaft Depth to Plan Total Depth Proper Pier No. Diameter bearing Pier Depth Water Present Casing Used (in.) Material (ft.) (ft.) (ft.) Alignment A-6.1 12 N/A 16 17.6 Yes No No AA-6,2 1 2 N/A 16 17.5 Yes No No AA-6.5 1 8 N/A 15 16.7 Yes No No AA-7 18 N/A 15 16.8 Yes No No AA-8 12 N/A 16 17.8 Yes No No BB-6.3 12 N/A 16 17.7 Yes No No BB-6.5 12 N/A 16 17.5 Yes No No BB-6.8 12 N/A 16 17.6 Yes No No CC-7 12 N/A 16 17.5 Yes No No CC-7.8 l 2 N/A 16 17.5 Yes No No A-7.8 12 N/A l 6 17.8 Yes No No A-6.5 18 N/A 15 17.6 Yes No No A-7 18 N/A 15 16.2 Yes No No B-7 12 N/A 16 I8.5 Yes No No B.5-7 12 N/A 16 18.8 Yes No No C-5 12 N/A 16 18.3 Yes No No C-6 12 N/A 16 17.5 Yes No No Remarks: Reinforcing steel was checked on all tiers and found to be in accordance with project requirements; unless otherwise noted. Pier observation was performed in accordance with plan sheet no. 1 and 2 prepared by Larry Smith Engineers, dated 11-27-02. Pier numbers were assigned on plans at the time of drilling. Bearing Material: N/A Fargo Technician: Gary Moore, CET Fargo Consultants, Inc. Checked By~ Environmental Services · Geotechnica/ Engineer~rig · Construct/on Maler/a/s Test/ng 11440 Reeder Rd. ° Dallas, TX 75229 Tel. (214) 352-4100 · Fax (214) 352-4811 Page 2 of 2 DRILLED PIER REPORT Client: Bonner Associates Project: Callahan Addition Date of Observation: 01-07-03 Projeet No: M02-412 Concrete Supplier: Redi-Mix Drilling Contractor:Long & Long Pier Drilling Shaft Depth to Plan Total Depth Proper Water Present Casing Used Pier No. Diameter bearing Pier Depth (~.) Alignment (in.) Material (ft.) (ft.) C-7 12 N/A 16 17.7 Yes No No E-5 12 N/A 16 18.8 Yes No No E-5.5 12 N/A 16 17.8 Yes No No E-6 12 N/A 16 18.3 Yes No No E-6.5 12 N/A 16 17.8 Yes No No E-7 12 N/A 16 17.5 Yes No No C.8-7 12 N/A 16 17.8 Yes No No D.5-7 12 N/A 16 17.5 Yes No No C.8-5 12 N/A 16 17.7 Yes No No B-6 12 N/A 16 17.5 Yes No No C.8-6 12 N/A 16 17.6 Yes No No Remarks: Reinforcing steel was checked on all piers and found to be in tccordance with project requirements; unless otherwise noted. Pier observation was performed in accordance with plan sheet no. 1 and 2 prepared by Larry Smith Engineers, dated 11-27-02. Pier numbers were assigned on plans at the time of drilling. Bearing Material: N/A Fargo Consultants, [nc. Fargo Technician: Gary Moore, CET Checked By ~t//~/tt/ Distribution: Bonnet Associates - Tim Bonnet City of Coppell - Rick Odell C3 Contractors - Taylor Barnes Environmental Services · Gootochnical Engineering · Construction Matoda/s Testing