Callahan-LR030106FAROO CONBULTANTB, INC. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Bonner Associates PROJECT: Callahan Addition Connell. Texas Sample Date: 01-06-03 Project No.: M02-412 CONCRETE INFORMATION CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: C3 Contractors 103022 CONCRETE SUPPLIER: Redi-Mix 57 PLANTITRUCK: 1/ 106 62 MIX ID NUMBER: 919 3:09 p.m. AIR (%) (ASTM C-231) - 4:05 p.m. WATER ADDED (gal): 0 Partly cloudy SLUMP {inches) (ASrM c-tai) 5 Piers C-4, C.5-4, D-4, E-3.9, E.5-4, E-4.3, E.7-4.3, E.7-1.5, F-2.7, F-3.3, E.8- 2.2, E.6-3, E.5-2, E-1.5, E-1, D-1, D-3, D-2, C.3-2, C.3-3, and C-2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (Pounds) COMPRESSIVE STRENGTH (Psi) SPECIFIED COMPRESSIVE STRENGTH (Psi) 1A 7 1-13-03 70000 2480 3000/28da s 1 B 28 2-03-03 1 C 28 2-03-03 1 D Hold -- Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Curin Technician: Gary Moore, CET FARGO CONSULTANTS, INC. Checked By: ~~ Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick Odell C3 Contractors -Taylor Barnes Environmental Services / Geotechnica/ Engineering /Construction Materia/s Testing FAROO CONSULTANTS, INC. 11440 Reeder Rd. ~ Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-451 I REPORT OF FIELD COMPACTION Tested For: Bonner Associates Project: Callahan Addition Coppell, Texas Date Performed: 01-06-03 FCI Project No.: M02-412 Density: Per ASTM D-2922 Moisture: Per ASTM D-3017 Test Mode (DT / BS): DT MOISTURE/DENSITY RELATIONS Gauge Manuf.: Humboldt Gauge Model: HS-SOOlEZ Probe Depth: 6 inches Proctor No. Material Description Optimum Moisture % Maximum Dry Densit PCF 4 Dark Brown Clay and Brown Clay with Calcareous nodules 22.0 101.5 IN-PLACE TEST RESULTS Test Elevation or Location Proctor Percent Dry Density Percent No. Lift No. Moisture PC Density St Storm drain, 140' south from north inlet at northwest 61 1 4 21 1 96 6 95 2 corner of east arking . . . ^d Storm drain, 40' south from north inlet at northwest 62 2 4 21.0 98.7 97 2 corner of east arkin . rd Storm drain, 55' south from north inlet at northwest 63 3 4 21 6 97 4 96 0 comer of east parking . . . (R) AFTER TEST NUMBER INDICATES RETEST (F) INDICATES FAILURE TO COMPLY WITH PROJECT REQUIREMENTS Technician: Gary Moore, CET Checked By: ~~~ Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick Odell C3 Contractors -Taylor Barnes LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no rupoasibility for variation in quality (composition, appearance, perfomance, etc.) or any other failure of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the client's to whom they are addressed and shall not be reproduced except in full without the written approval of Fargo Consultants, ]nc. Environmental Services ^ Geotechnica/ Engineering ^ Construction Matena/s Testing FAR.60 CONSIILTANTB, INC. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Bonner Associates PROJECT: Callahan Addition Co>,pell, Texas Sample Date: 01-06-03 Project No.: M02-412 CONCRETE INFORMATION CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: C3 Constructors 103022 CONCRETE SUPPLIER: Redi-Mix 57 PLANTfTRUCK: 1/ 106 62 MIX ID NUMBER: 919 3:09 p. m. AIR (%) (ASTM C-231) - 4:05 p. m. WATER ADDED (gal): 0 Partly cloudy SLUMP (inches) (ASTM c-~a3) 5 Piers C-4, C.5-4, D-4, E-3.9, E.5-4, E-4.3, E.7-4.3, E.7-1.5, F-2.7, F-3.3, E.8- 2.2, E.6-3, E.5-2, E-1.5, E-1, D-1, D-3, D-2, C.3-2, C.3-3, and C-2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (Pounds) COMPRESSIVE STRENGTH (Psi) SPECIFIED COMPRESSIVE STRENGTH (Psi) 1A 7 1-13-03 70000 2480 3000128 da s 16 28 2-03-03 130000 4600 1C 28 2-03-03 128000 4530 1 D Hold - Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Curin Technician: Gary Moore, CET FARGO CONSULTANTS, INC. Checked By: ~~~~ Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick Odell C3 Contractors -Taylor Barnes Environmental Services / Geofechnica/ Engineering ^ Construction Materials Testing i FAROO CONBULTANTB, INC. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 Page I of 3 DRILLED PIER REPORT Client: Bonner Associates Project: Callahan Addition Date of Observation: 01-06-03 Project No: M02-412 Concrete Supplier: Redi-Mix Drilling Contractor:Long & Long Pier Driving Pier No. Shaft Diameter in. Depth to bearing Material (ft.) Plan Pier Depth ft, Total Depth (ft.) Proper Alignment Water Present Casing Used A-1 12 N/A 16 17.8 Yes No No A-2 12 N/A 16 17.5 Yes No No A-2.5 12 N/A 16 17.9 Yes No No A-3 12 N/A 16 17.5 Yes No No A-3.5 12 N/A 16 17.8 Yes No No A-4 12 N/A 16 17.8 Yes No No A-4.5 12 N/A 16 17.7 Yes No No A-5 ] 2 N/A l6 17.6 Yes No No A-5.5 12 N/A 16 17.5 Yes No No B-1 12 N/A 16 17.8 Yes No No B-2 12 N/A 16 17.8 Yes No No B-3 12 N/A 16 17.8 Yes No No B-4 12 N/A 16 17.5 Yes No No B-5 12 N/A 16 17.8 Yes No No B.5-1 12 N/A 16 ]7.6 Yes No No C-1 l2 N/A 16 17.6 Yes No No C-2 l2 N/A 16 17.9 Yes No No C-4 12 N/A 16 17.6 Yes No No Remarks: Reinforcing steel was checked an al! piers and found to be in accordnnce with project requirements, unless otherwise noted. Pier observation was performed in accordance with plan, Skeet no. 1 and 2 prepared by Lnrry Smith Engineers dated 11-27-02. Pier numbers were assigned on plans at the time ojdrilling. Bearing Material: N/A Fargo Consultants Fargo Technician: Gary Moore, CET Checked By Environments/ Services ~ Geotechnical Engineering ~ Construction Materials resting FAROO CONSULTANTS, INC. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 DRILLED PIER REPORT Page 2 of 3 Client: Bonner Associates Project: Callahan Addition Date of Observation: 01-06-03 Project No: M02-412 Concrete Supplier: Redi-Mix Drilling Contractor:Long & Long Pier Drilling Pier No. Shaft Diameter (in.) Depth to bearing Material ft. Plan Pier Depth ($. Total Depth ~~~) Proper Alignment Water Present Casing Used C.3-2 ] 2 N/A l6 17.6 Yes No No C.3-3 12 N/A 16 18.0 Yes No No C.5-1 12 N/A 16 17.9 Yes No No C.5-4 12 N/A 16 17.6 Yes No No D-1 12 N/A ]6 17.8 Yes No No D-2 12 N/A l6 17.8 Yes No No D-3 12 N/A 16 17.5 Yes No No D-4 12 N/A 16 17.8 Yes No No E-1 12 N/A 16 17.6 Yes No No E-I.5 12 N/A ]6 17.6 Yes No No E-2.1 12 N/A 16 17.6 Yes No No E-3.9 12 N/A 16 17.5 Yes No No E-4.3 12 N/A l6 17.7 Yes No No E.5-2 12 N/A 16 17.8 Yes. No No E.5-4 12 N/A 16 17.8 Yes No No E.6-3 12 N/A 16 17.8 Yes No No E.7-LS 12 N/A 16 17.9 Yes No No E.7-4.3 12 N/A 16 17.9 Yes No No E.8-2.2 12 N/A I6 ] 7.8 Yes No No Remarks: Reinforcing steel was checked on alt piers and Jound to be in accordance with project requirements; unless otherwise noted. Pier observation was performed in accordance with plan, Sheet no. 1 and 2 prepnred by Larry Smith Engineers dated 11-27-02. Pier numbers were assigned on plans at the time ojdrilling. Bearing Material N/A Fargo Consultants, Inc. Fargo Technician: Gary Moore, CET Checked By_~~ Environments/ Services ~ Geofechnica/ Engineering ^ Construction Maleria/s Testing FAROO CONBULTANTB, INC. 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (2 L4) 352-4811 Page 3 of 3 DRILLED PIER REPORT Client: Bonner Associates Project: Callahan Addition Date of Observation: 01-06-03 Project No: M02-412 Concrete Supplier: Redi-Mix Drilling Contractor:Long & Long Pier Drilling Pier No. Shaft Diameter (in.) Depth to bearing Material ft. Plan Pier Depth (ft. Total Depth ~ft~) Proper Alignment Water Present Casing Used E.8-3.8 12 N/A 16 17.5 Yes No No F-2.7 12 N/A 16 17.8 Yes No No F-3.3 12 N/A 16 17.7 Yes Na No Remarks: Reinforcing steel was checked on all piers and found to be in accordance with project requirements; unless otherwise noted. Pier observation wns performed in accordance with plan, Sheet no. 1 and 2 prepared by Larry Smith Engineers doted l1-27-02. Pier numbers were assigned on plans at the time of drilling. Bearing Material: N/A Fargo Consultants, C Fargo Technician: Gary Moore, CET Checked By Distribution: Bonner Associates -Tim Bonner City of Coppell -Rick Odell C3 Contractors -Taylor Barnes Environmental Services / Geotechnica/ Engineering /Construction Materials Testing