Loading...
Callahan-LR021106FAROO CONSULTANTS, INC. DAILY FIELD REPORT Tested For: Bonner Associates Project Name: Callahan Addition Coppell, Texas Weather/ Temperature: Clear / 55-60 (F) 11440 Reedet Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 Date Performed: 11-06-02 FCI Project No.: M02-412 The Fargo technician traveled to the above referenced site as requested to perform field testing. The condition of the fill at this time was such that the required compaction could not be attained. The fill was very wet and needed to dry out. The technician was informed that T. Barnes would call in the morning. At the completion of the scheduled testing, the technician returned to the office. Technician: Dan Rotty, EIT Respectfully Submitted, Fargo Consultants, Inc. Environments/ Services ~ Geotechnica/ Engineering ~ Construction Materia/s Testing